Appendix D - Noosa Plan 2020 Assessment
Plans and drawings: the text below has words only, no drawings.
Performance Outcomes Acceptable Outcomes Response
b) ensure the development discharge in accordance with stormwater infrastructure and the
is adequately drained; PSP6 Engineering Design appropriateness of the proposal.
and Standards - Roads, drainage and
c) ensure stormwater is earthworks.
managed and lawfully
discharged without AO2.3
altering stormwater Stormwater flows discharging
drainage characteristics from the development are
external to the site. demonstrated to be consistent
with predevelopment
characteristics.
AO2.4
Development provides for the
management of stormwater to
incorporate appropriate
allowance for climate change
impacts (including rainfall
intensity and sea level rise), in
accordance with PSP6
Engineering Design Standards –
Roads, Drainage and
Earthworks.
PO3 AO3 PO3 Complies
Stormwater drainage Stormwater drainage The proposed stormwater
infrastructure conveys run-off in a infrastructure meets the desired drainage infrastructure meets the
manner that allows roads to standards of service for roads standards set out in PSP6
deliver desired standards of functionality set out in PSP6 Engineering Design Standards -
service appropriate to the local Engineering Design Standards - Roads, Drainage and
conditions and local stormwater Roads, Drainage and Earthworks.
drainage characteristics. Earthworks.
PO4 AO4.1 PO4 Complies
Stormwater infrastructure is The location, design and The proposed stormwater
construction of stormwater
compatible with existing infrastructure is located,
drainage structures is in
infrastructure, allows for easy accordance with PSP6 designed and constructed in
access for the ongoing Engineering Design Standards - accordance with PSP6
maintenance by Council, is cost Roads, drainage and earthworks. Engineering Design Standards -
effective across its design life. Roads, Drainage and
AO4.2 Earthworks.
Where infrastructure is located
on private land an easement is
dedicated over the infrastructure
in accordance with PSP6
2
See the original