Original source · versioned page text
Appendix D - Noosa Plan 2020 Assessment
Plans and drawings: the text below has words only, no drawings.
Performance Outcomes Acceptable Outcomes Response
Engineering Design Standards -
Roads, drainage and earthworks.
AO4.3
Any alterations or repairs to
infrastructure as a result of the
development are made at no cost
to Council.
AO4.4
Development avoids stormwater
inflow and infiltration to the sewer
infrastructure network.
AO4.5
Stormwater infrastructure is
designed to minimise
maintenance costs and the
requirement for specialized
equipment for maintenance
techniques.
PO5 AO5.1 PO5 Complies
Stormwater drainage Stormwater drainage The proposal and its stormwater
infrastructure is aligned to avoid infrastructure avoids crossing management systems are
crossing waterways, wetlands, waterways, wetlands drainage planned and designed to have
drainage lines and ecological lines and ecologically important regard to the nature features of
important areas, or where it is areas or follows the edge of the site and to protect existing
demonstrated this is existing disturbed areas. surrounding environmental
unavoidable, disturbed areas are values.
reinstated and revegetated upon AO5.2
Whilst the site benefits from a
completion of works. Stormwater drainage frontage to the canal, the
infrastructure is co-located with proposal does not interfere with
other infrastructure within a waterways, wetlands, drainage
combined utility corridor where lines or ecologically important
appropriate. areas.
AO5.3 Please refer to the civil drawings
included in Appendix F for
Temporary vehicular crossings of
further details of the proposed
waterways must be designed and
stormwater design.
constructed to be consistent with
the current International Erosion
Control Association Best Practice
Book Series.
3
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.