Appendix D - Noosa Plan 2020 Assessment
Plans and drawings: the text below has words only, no drawings.
Performance Outcomes Acceptable Outcomes Response
PO14 AO14.1 PO14 Complies
Construction methods provide for An erosion and sediment control The proposal will implement
appropriate controls to avoid plan prepared in accordance with appropriate construction methods
entry and transport of litter, the International Erosion Control to ensure that works are
sediment, and associated Association Best Practice Books undertaken to mitigate impacts
prescribed water contaminants demonstrates that the capture into receiving waters including
into receiving waters. and release of stormwater transport of litter, sediment and
achieves the design objectives other contaminants.
listed in Table A: Construction
A reasonable and relevant
Editor's note— Water contaminants phase – stormwater
condition can be imposed to
are prescribed in the Environmental management design objectives
ensure that the construction
Protection Act 1994. of the State Planning Policy
methods implemented are
(Appendix 2).
appropriate and in accordance
Editor’s note— PSP6 Engineering with the requirements of the
Design Standards - Roads, drainage Environmental Protection Act
and earthworks provides guidance on 1994.
requirements for preparing an Erosion
Management Plan.
AO14.2
Construction works are designed
and managed to restrict the
extent of clearing and soil
exposure to the minimum
necessary for access, and safe
construction at any one time.
AO14.3
For buildings:
a) upstream runoff is
diverted around the
construction site;
b) sediment barriers are
provided downslope of
disturbed areas to
prevent sediment
washing into gutters,
drains and waterways ,
wetlands or drainage
lines either on or off the
site; and
c) temporary or permanent
downpipes are
connected to the
9
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.