Original source · versioned page text
Appendix D - Noosa Plan 2020 Assessment
Plans and drawings: the text below has words only, no drawings.
Performance Outcomes Acceptable Outcomes Response
stormwater system
before laying the roof; or
d) localised erosion is
avoided by directing flow
from downpipes over
non-erosive areas.
AO14.4
Chemical flocculants used as
part of an erosion and sediment
control plan do not harm the
environmental values within
receiving waters.
AO14.5
Appropriately sized litter
containment areas, with provision
for sorting recyclables are
provided for the type of litter
expected to be generated onsite.
Wastewater management and effluent disposal
PO15 A015 Not Applicable
Development does not discharge Wastewater (non-sewage) The proposal site is connected to
wastewater unless it can be generated from the development the sewer network and does not
demonstrated to not compromise is collected and contained involve on-site wastewater
environmental values of waters on-site, and is: management systems or effluent
and water quality objectives. treatments requiring separate
a) lawfully disposed to
discharge requirements.
Editor’s Note—Environmental values sewer; or
of waters and water quality objectives b) transferred off-site for
are prescribed in Schedule 1 of the treatment/disposal to an
Environmental Protection (Water) appropriately licenced
Policy 2009. facility;
c) reused on-site in a
closed-cycle irrigation
scheme, industrial
processes, washing or
cleaning or other
purpose; or
d) treated to meet the
drinking water supply
environmental values
prior to release.
Editor’s Note—The Plumbing and
Drainage Act 2003 sets out
10
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.