Appendix D - Noosa Plan 2020 Assessment
Plans and drawings: the text below has words only, no drawings.
Performance Outcomes Acceptable Outcomes Response
requirements for wastewater
management.
PO16 A016
On-site effluent treatment and An onsite effluent system and
disposal systems are designed, disposal area is:
constructed and managed to not
a) not located on a slope
compromise the environmental
greater than 1 in (10%);
values of waters and water
b) not located at or below
quality objectives.
the 1% annual
exceedance probability
(AEP flood event);
c) not located within a
riparian buffer area
mapped on a
Biodiversity, Waterways
and Wetlands Overlay
Map; and
d) setback 400 metres
minimum from the full
supply level of Lake
Macdonald.
Editor’s Note—The Plumbing and
Drainage Act 2003 sets out
requirements for on-site effluent
treatment and disposal. The Queensland
Plumbing and Wastewater Code and
associated guidelines are used to
confirm the suitability of each site to
accommodate an on-site sewerage
facility; or where a centrally located
group collection treatment system is
proposed, confirmation as to the
suitability of the designated site to
accommodate the on-site sewerage
facility. Additionally, where the
combined total peak design capacity of
effluent treatment is less than 21
equivalent persons, the design of the
system achieves a low to medium risk
classification in accordance with
Seqwater’s Land Use Risk Tool for
onsite sewerage facilities.
11
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.