DRAWING SIZE — A2
PIER REINFORCEMENT
{__ DEPTH REINFORCEMENT
0 - 1200 None required
1200 ~ 2400 [2 ~ NI2, RG Ligs 60Dctd
2400 ~ 4500 | 4 - N12 RE Lige G00ct]
Pir rokrcaent la ba Ad Hl and be copped en inno! 400
990 hing tp renieromnart,
@ 3H dia. concrete footing piers, 20m ctrs
mox, founded 300 into NATURAL MEDIUM
DENSE SLTY SANDS, or founded 300 below
CRITICAL DEPTH SEWER UNE. whichever the
greater.
Piers supporting strip:
footings or post pad
footings founded nto
selected moterid ond below
critical [ine ore considered
stable.
CRITICAL DEPTH LINE
Horizonte
]
he
i a
Po
=== 3
FA
q
FA
Por
fA
CF-O1 to be q
founded under~
block walls. |
FF
= S|
-01
Ga
FA
|
rr
. g
FP-1's ADJACENT SEWER UNE
TO BE FOUNDED 300 BELOW
SEWER CRITICAL DEPTH UNE
or 300 INTO NATURAL NEDUM A
DENSE SILTY SANDS WHICH - — [|___@
EVER THE GREATER,
LEGEND POOL PLAN
CF-O1 — 450(41)x400(0) Continuous Footing refer
details,
fP-1
jithout piers
is founded
ee above critical
This toating is Las depth line ond
founded below Stable is unstable.
cried line and is
stable.
Assume position of council | sewer line.
Existing timber
retaining val
Sewer
Man Hole
LL 41.92
The builder /contractor
shall confirm ail relevant
levels prior to:
commencing
works.
| tre ‘of proposed
Pool Excovation or
athe trench.
4 - St2 horizontal bars, 250
continuous, equally speced in edge.
‘S12 9 250 vert &
hori one
{pisced centre)
(900 Nox. wail ht}
300 Wox.
Kotural
300 mh.
TRC.
thickening, \ *
160 Nin.
CTION
150 Min.
i © 100. centres.
150 kin.
Sa box ia
‘sccordonce with
ASIS26
Mi x
Locate skimmer box
80 flop foces
prevaling wind.
‘St2 © 100mm centres
ound skimmer bor.
lo Fiter
SECTION
32-400 both
rections
—>— Block sail.
Cast in starter
where required.
Trench mesh 431TW top
& bottom or equivalent.
Centre footings over
concrete piers.
1000 Nox,
Hycrostatic pressure rdief vatve to
current Australian Standard. Seded
and bonded te podl floor in
accerdance with the moufoctures
sficatic
Fal.
201) Mox.
4 - S12 horizontal bers,
2 250 continuous, equally
= spoced in edge
thickening,
Woter line.
= fF g
160 Win.
S12 & 250 vert x
3 & horiz. uno. =
= {ploced centre) 3
g =
rd Strota 4
6a
Additional S12 - 250 vert placed
between other verts, extend post
radius as shown.(ie. S12-125)
PS cantnue 512 6 150 cmttes rod
100mm thick compocted 10mm
to 20mm dean crushed rock
fite medio.
waive in both directions -
top= 300mm
300mm x 500mm pit filed with
10mm to 20mm crushed rock (no Tri
fines) filter material.
Wrop in geotertie membrone.
TON -
Where radius less thon
500mm provide
Additiond $12-200
Horizontels, Between
main bars.
VERTICAL CORNER DETAIL.
Si2 8 250 vet &
horiz. u.n.0.
{placed centre)
Revision | Description Date
A. Footing piars & CF-01 added to pool 17.04.07.
er yer
$12 @ 250 vert &
horiz. uno.
{placed centre}
SHELF DETAIL
GENERAL NOTES :
— Pool to be constructed in accordance with AS 2783 and
councd safety requirements.
~ Concrete Strength Fe = 32MPo at 28 days (effective
cement content to be not less than 2B0kg per m3) for pools
within 1km of forge exponses of soit water such as the sec
(but poal not to be constructed in tidal splash zones of salt
water). Where pools are constructed more than thm from
large expenses of salt weter (such as the seo) the concrete
strength moy be reduced to 25MPa.
— Admixtures to comply with ASI478
= Concrete sump 80mm.
~ Concrete to be sprayed in a continuous operation ond cured
for 7 days minimum. This involves keeping the walls and ficor
surface moist in an opproved manner (ie. fog sproy)
Altematively the surface con be sprayed with conflm or
equally approved additive,
— Rod concrete in walls to remove all air pockets (only
worate in tight comers). .
- Do not use curing compounds which affect the bonding of
applied coatings.
- Reinforcement - All steel to be grade 250 S bors.
Reinforcement - minimum cover 70mm +5/-Omm
~ Reinforcement lops 500mm for S bors.
— All reinforcement bars to be continuous around all comers
and curves and shall be lopped U.N.O.
Minimum stripping and/ or bockftling time is 14 days.
~ The find poot shape and layout should be approved by the
engineer prior to commencement of works.
~ All fences ond gates surrounding poo! oreo shall be in
accordance with ASI926.
~ The pool excavotion shail in no way undermine ony adjacent
structures or services (Refer to critical line diagram provided}.
The pool contractor /builder is responsible for obtoining all
relevant levels and positions of adjacent structures pricr to
commencing work.
issue:
CONSTRUCTION
GARB CONSULTING
OB Ie
ABN 40 098 48:
ENGINEERS
18 DUKE STREET SUNSHINE BEACH QLD.4567
Ph (07) 5447 5544 Fax (07) 5447 2634
Title: POOL CONSTRUCTION DETAILS
Project Lot 161 Orealta Cres,
Sunrise Beach.
Date: May 2006. Drg No. 16115-PD
*A.
Beto sg07 455.98 te
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/0387 - Submitted plans [As Published]Related documentApplication case desk ↗
About this file
- File size
- 2.7 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.