Council archive · source document
Cover Letter_GIA Request_22-10-2019 · 132005.1133.12
A GIA is necessary due to condition 9 of the Decision Notice for Noosa Parkridge, which states:
A verification survey of the building is to be carried out by a Licensed Surveyor and a certificate lodged with Council
at completion of work for each stage confirming compliance with the maximum RL’s shown for each building on the
approved plans of development.
Could you please provide payment advice for Council’s assessment fee in the amount of $616.00 for the Generally
in Accordance to allow our client to make direct payment.
Should you require any further information, please contact our office on (07) 5450 3900.
Yours faithfully,
ALLISON DRABSCH
Senior Urban Planner
JFP URBAN CONSULTANTS PTY LTD
Encl:
Amended Architectural Drawings prepared by Blackburne Jackson Design
cc: Altum Constructions Pty Ltd
JFP Ref: M2652/F Page 2
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Cover Letter_GIA Request_22-10-2019.pdfRelated documentApplication case desk ↗
About this file
- File size
- 200 KB (small file)
- File type
No other editions are linked here.