Minor Change Existing Approval - 132003.220763.2 (As Published)
9. Security in the form of a cash bond or trading bank guarantee to the sum of $5000 must be
submitted, to secure performance of all conditions of this approval, prior to the issue of a
Development Permit for building works. The cash bond or trading bank guarantee will be
returned on performance of the conditions of approval less any costs incurred by Council in
respect of enforcing performance of this permit.
10. The requirements of this development approval are to be effected, prior to the use of the
premises. Council reserves the right to call upon the bond or guaranteed sum referred to in
this approval to effect compliance with conditions.
11. This Development Permit for a material change of use of premises lapses if:-
11.1. the use or erection of a building or other structure associated with the use, has not
been commenced by 20 May 2007, unless application is made and approved by
Council for an extension; or
11.2. the use of any premises pursuant to the Development Permit ceases.
12. The developer must obtain all of the other Development Permits referred to in the Decision
Notice, prior to obtaining a Development Permit for building works.
Land Development
Car Parking
13. Prior to occupation of the proposed dwelling, 2 off street car parking spaces (proposed within
a double garage) with a sealed access complying with AS2890.1 - 1993 shall be provided.
Stormwater Drainage
14. All on site stormwater including roof water is to be disposed of on site via an infiltration pit
and in a manner that does not compromise the stability of the site.
Earthworks
15. If any excavation work is required at or near any of the boundaries for the purpose of footing
and foundation construction, care must be taken to ensure no earthworks/batters extend over
the property boundary.
16. The site is located in a Sand Dune Problem Area and will require appropriate soil testing by
a Geotechnical Engineer and design of a soil retaining system by a Structural Engineer.
Clearance shall be obtained from Council’s Manager of Building as part of the process of
obtaining a Development Permit for Building works.
Erosion & Sediment Control
17. To protect the environment against siltation/sediment export or soil erosion as a result of this
development, an erosion and sediment control plan shall be submitted in conjunction with
any Development Permit for Building Works. Site control measures such as silt fencing,
controlled gravel access to the site and controlled disposal of waste, may be necessary. Prior
to commencement of building works, all physical site control measures shall be installed, and
the plan adhered to.
General
18. The alteration of any public utility or other facilities necessitated by the development of the
land or associated construction works external to the site shall be at no cost to Council.
Building
19. A verification survey of the building is to be carried out by a Licensed Surveyor and a
certificate lodged with Council at completion of the work confirming compliance with the
maximum building height above natural surface, required by the provisions of the Planning
Scheme.
Page 3 of 6
Document Set ID: 24108016
Version: 3, Version Date: 09/09/2025
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Minor Change Existing Approval - 132003.220763.2 (As Published).pdfRelated documentApplication case desk ↗
About this file
- File size
- 152 KB (small file)
- File type
No other editions are linked here.