20. The Geotechnical report submitted as part of your application has been appraised and
approved subject to the following conditions:-
20.1. There is to be no uncontrolled discharge of water onto the slope;
20.2. Stripping of vegetation for construction purposes should be minimised. If vegetation is
destroyed it should be reinstated immediately after construction is completed;
20.3. The use of vibratory equipment of any kind is not permitted to be used, including
vibrating rollers, the use of vibrating installation techniques for sheet piling and other
construction vibrations caused by excavating, earthmoving or demolition machinery or
other similar construction techniques.
Landscaping
21. The site is to be landscaped in accordance with Council’s Policy on Landscaping Guidelines
and the approved Plan of Development. The approved plans are numbered tp-10 prepared
by Vast Environments dated march 03 and titled Planting Schedule and dated 20/5/03 and
may be amended by these conditions.
22. Landscaping is to be completed prior to the premises being occupied and maintained at all
times thereafter.
23. All vegetation beyond the building envelope is to be retained in accordance with the Plan of
Development and is to be clearly delineated during the construction phase.
24. All manholes, inspection pits and grates are to be raised to finished surface levels and kept
free of cover and be visible at all times to ensure prompt access in case of emergency.
Coastal protection/Building appearance
25. External colours and finishes of the dwelling must be of muted/environmental tones that
blend with the natural environment and have low-reflective roofing and cladding materials.
5. REFERRAL AGENCIES
Not applicable.
6. ADVISORY NOTES
The following notes are included for guidance and information purposes only and do not form part
of the assessment manager conditions:
Advice
1. Lot 2 on SP111721 was known to be in an area contaminated by unexploded ordnance. Any
person acting on this permit shall exercise care when excavating. Should an object be found
the developer is to contact the local police immediately. The developer is responsible to
ensure all persons acting on this permit are aware of this advice condition.
2. The requirements of the Environmental Protection Amendment Regulation (No. 2) 1999 and
Local Law No. 12, prevents a builder or building contractor carrying out building work on a
building site in a way that makes or causes audible noise to be made from the building work:-
2.1. On a Sunday or public holiday, at any time; or
2.2. On a Saturday or a business day, before 7.00am or after 6.30pm.
A maximum penalty of $1,500 applies to an offence under this legislation.
3. In accordance with the Environmental Protection (Water) Policy 1997, all sand, silt, mud,
paint, cement, concrete, builder’s waste or rubbish shall not be permitted to enter or be
placed where it could reasonably be expected to move into a roadside gutter, stormwater
drain or a watercourse. On the spot fines apply for such offences.
Page 4 of 6
Document Set ID: 24108016
Version: 3, Version Date: 09/09/2025
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Minor Change Existing Approval - 132003.220763.2 (As Published).pdfRelated documentApplication case desk ↗
About this file
- File size
- 152 KB (small file)
- File type
No other editions are linked here.