Original source · versioned page text
Appendices 4 - Traffic and 5 - Engineering Email 2 of 4 - MCU16/0153 & REC16/0041
Very large file: it may take a few minutes
The original of this document is very large (14.0 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
ENGINEERING SERVICES REPORT Client: Thomco (No 2087) Pty Ltd Location: 215 David Low Way, Peregian Beach Along the southern boundary with the Noosa National Park, a ‘fill’ wall of approximately 2.0m will be required. These walls will most likely be of a concrete sleeper, or similar, construction. This would continue the existing wall in-situ. Along the northern boundary, ‘fill’ walls of approximately 1.5m height will be required. These walls will most likely be of a concrete sleeper, or similar, construction. At the eastern boundary with the Peregian Tavern, some shallow excavation will be required. Care will need to be exercised during any excavation to ensure that there is no undermining of the existing block retaining wall (up to 2.0m high). Terracing is proposed at the front of the existing wall to aid in stability and mitigate the visual impact. Works in this area will be subject to geotechnical investigation and advice. All filling will be in accordance with AS3798-1996 (Level 1). Refer Appendix B for Preliminary Bulk Earthworks Plan. 6.0 ROADWORKS Access to the site will occur from Sandpiper Court, through the newly completed Peregian Market access. An access easement will be established through this area. The internal road network consists of an access road past the short-term residential accommodation building and loop road to service the remainder of the dwellings, access the parking spaces for individual units and other parking areas. The internal road, to the point of access to the carpark, will be a minimum of 6m wide (typically 11.0m road reserve) with the remainder being 5.5m wide (typically 11.5m road reserve). All roads are to be of a concrete, inverted crown construction. It is proposed that the internal roads would cater for a heavy rigid vehicle (HRV) and a rear lift refuse collection vehicle (RCV) to service the short-term residential accommodation building. Widenings at horizontal curvature are included to facilitate the larger vehicle movements. Vehicle manoeuvring paths are presented in the Traffic Impact Assessment by PTT. Car parking will be provided in accordance with the Noosa Planning Scheme (2006) and is detailed in the Traffic Impact Assessment by PTT. 7.0 STORMWATER DRAINAGE The site generally slopes from the David Low Way to the Noosa National Park. The stormwater discharge point from the site is the Council Reserve to the west. This land is under council control and the stormwater discharge will not cause an actionable nuisance therefore, as per QUDM (2013), this is considered a lawful point of discharge. The stormwater quality effects of the development will be reviewed in a separate Stormwater Management Plan (SMP). The treatment of stormwater will be carried out in accordance with state and local authority requirements. Road and surface runoff will generally be directed to treatment areas via the concrete inverted crown road. Roof runoff will be directed to treatment areas via a shallow pipe network. Covey Associates Pty Ltd 6 Project No: 162042 Consulting Engineers 100493RPT Issue A
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.