Original source · versioned page text
Appendices 4 - Traffic and 5 - Engineering Email 2 of 4 - MCU16/0153 & REC16/0041
Very large file: it may take a few minutes
The original of this document is very large (14.0 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
ENGINEERING SERVICES REPORT Client: Thomco (No 2087) Pty Ltd Location: 215 David Low Way, Peregian Beach 8.0 SEWERAGE RETICULATION To facilitate the layout of the development, it is proposed that the existing 150mm diameter gravity sewer main through the site be re-aligned. An easement will be provided over the realigned main. Three connection points are proposed to the Unitywater infrastructure along the re-aligned gravity main to connect the development. A private sanitary drainage network is proposed to service the community titled lots, units and Motel. Refer Appendix B for the Preliminary Sewerage and Water Reticulation Layout. 9.0 WATER RETICULATION Unitywater’s as constructed records show that a water reticulation main exists on the western side of the David Low Way across the frontage of the site. It is proposed to service the development from the existing water infrastructure on the David Low Way with an extension down the pedestrian access lane to the Peregian Beach Sports Ground (Lot 75 on MCH839108). As this is a Community Titled development a Unitywater meter is proposed at the Peregian Sports Ground boundary with a private sub-metering arrangement throughout the remainder of the development. The diameter the water main extension and dimensions of the proposed infrastructure will be subject to detailed internal hydraulic design. Refer Appendix B for the Sewerage and Water Reticulation Plan. 10.0 ELECTRICITY AND COMMUNICATIONS Overhead powerlines currently exist on the David Low Way. It is expected that electrical supply will be able to be provided by installing underground infrastructure down the Peregian Sports Reserve access strip. According to as constructed records and site inspection, underground telecommunication infrastructure exists in the Peregian Sports Reserve access strip. It is expected that telecommunication connection will be able to be provided from this location. It is likely however that some augmentation will be required to comply with current standards. 11.0 CONCLUSION This Report has considered all anticipated engineering aspects associated with this development. It has found that all engineering facets of the proposed development can be catered for. It was found that all required services were available to the development with some augmentation of the existing infrastructure. The site does have a lawful point of stormwater discharge and is not affected by flood waters. Covey Associates Pty Ltd 7 Project No: 162042 Consulting Engineers 100493RPT Issue A
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.