Original source · versioned page text
2014-01-13 Deamalgamation Report Attachment
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
Page 17 of 95
Balance Sheet Item Proposed Allocation Method
Cash and cash equivalents | Should any additional items be identified for adjusting against the cash balance those
items are to be identified, costed and agreed by the transfer committee prior to
inclusion in the calculation of the final cash adjustment
Trust fund cash and cash Allocated based on geographical area in accordance with the underlying transaction as
equivalents at 31 December 2013.
Receivables Rates receivables to be transferred to NSC based on the new LG boundary lines.
Other Receivables (including the Unitywater working capital facility) to be taken into
account in the 31* December cash balance as though all cash has been received.
Land held for development | Based on the location of the land parcel as at 31 December 2013.
Land held for resumption Based on the location of the land parcel as at 31 December 2013.
meno Based on the physical location of the inventory as at 31 December 2013.
Prepayments Rates prepayments to be transferred to NSC based on the new LG boundary lines
Other prepayments to be reviewed to determine if an adjustment needs to be made to
the opening cash balance
Land and Improvements Physical location of the land / improvement according to new LG boundaries
Finance Branch to determine allocation based on physical location with assistance
from Property Management branch as and when required
Buildings Physical location of the building according to new LG boundaries
Finance Branch to determine allocation based on physical location with assistance
from Infrastructure Services Department as and when required
Plant and Equipment As per “Position Paper Other Items allocation”
Road and Bridges Physical location of the infrastructure according to new LG boundary
Finance Branch to determine allocation based on physical location with assistance
from Infrastructure Services Department as and when required
Stormwater and Drainage | Physical location of the infrastructure according to new LG boundary
Finance Branch to determine allocation with assistance from Infrastructure Services
Department as and when required
Other Infrastructure Physical location of the infrastructure according to new LG boundary
Finance Branch to determine allocation based on physical location with assistance
from Other Departments as and when required
Physical location of the infrastructure according to new LG boundary
Page 2 of 9 v5.0
Page 17 of 95See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.