Original source · versioned page text
2014-01-13 Deamalgamation Report Attachment
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
Page 18 of 95
SE] EL td Proposed Allocation Method
Finance Branch to determine allocation based on physical location with assistance
from Other Departments as and when required
Unitywater shareholder loan - estimate of share of RAB as at 30 June 2010
Intangibles — Computer Principle 1 - Physical location when the software can be identified as solely servicing a
Software specific region
Principle 2 — Due to the nature of software licencing, the allocation will be determined
by the supplier of the license. The allocation will ensure that SCC receives all licenses
required to continue operating with NSC acquiring any additional license required.
Principle 3 — Where a service agreement is required for Noosa to access SCC software,
allocation will be 100% SCC
Working group required to identify and provide an agreed schedule of allocated
software that reconciles to the balance sheet as at 31 December 2013
Trade and other payables SCC to honour all outstanding payments to suppliers for work completed prior to the
1st of January 2014.
Closing cash balance as at the 31st of December to be adjusted as though all payments
have been made.
Total debt allocated made up of:
1) Opening debt balance of each Council as at 30 June 2012 determined by QTC
analysis.
2) plus new borrowings in proportion to the value of capital expenditure made by the
existing council in the new council and continuing council geographical area
3) less redemptions made by the existing council in proportion to the value of
borrowings held by the new council and continuing council
Employee Provisions Based on the calculated employee annual leave and long service leave provisions
attaching to transferring staff as at 31 December 2013.
Other provisions Landfill rehabilitation — based on the calculated landfill rehabilitation provision for the
Eumundi Road landfill as at 31 December 2013.
Quarries - based on the calculated quarry rehabilitation provision for the Ringtail quarry
as at 31 December 2013.
Other provisions - Allocated in accordance with the underlying transaction.
Other assets and liabilities | Based on balance of other assets and liabilities as at 31 December 2013 allocated in
accordance with the underlying transaction.
Timing of Actual Balance Sheet Allocation
Page 3 of 9 v5.0
Page 18 of 95See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.