Original source · versioned page text
2014-01-13 Deamalgamation Report Attachment
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
Page 26 of 95
Proposed Allocation Principles
The following principles are proposed to be applied when separating each type of item. The list is not
exhaustive and may need further refinement as the process evolves.
OTHER ITEMS (Including Portable and Attractive Items)
aA Ae Allocation Principles
Information communication Principle 1 - Physical location when the ICT item is not user specific and can be
technology (ICT) items and identified as specifically servicing a particular region (i.e. printer, hot-desk
equipment (including leased) desktop phone & computer)
Principle 2— Where the ICT item is user specific (i.e. mobile phone,
tablet/PC/laptop computer, PDA device, desk phone) the item ‘follows’ the
user (i.e. transfers with the staff member should they be transferred to
Noosa).
Working group required to identify and provide an agreed schedule of ICT
items and equipment as at 31 December 2013
Leased fleet and plant A working group is required to identify and provide a reconciliation of current
plant and equipment, and the requirements of both the continuing and news
councils. The working group will aim to allocate PP&E to ensure that SCC
receives all PP&E required to maintain their geographical area, taking into
account the requirements by NSC. For PP&E items which cannot meet these
requirements a listing will be brought before the transfer committee for
resolution.
Working group required to identify and provide an agreed schedule of
allocated leased plant and equipment as at 31 December 2013
Building furniture and equipment Physical location of the furniture and equipment according to new LG
boundary
Working group required to identify and provide an agreed schedule of
allocated furniture and equipment as at 31 December 2013
Library Catalogue Physical location of books / resources according to new LG boundary
Library resources not located within a library as at the 31st December 2013
are to be allocated based on the proportion of library facilities
Working group required to identify and provide an agreed schedule of
allocated library books and resources as at 31 December 2013
Small plant and tools / specialised Principle 1 - Physical location when the item is not portable in nature and is
equipment / other equipment physically located in a particular region (i.e. workshop tools and equipment,
pool equipment, surveying equipment etc.)
Principle 2 - Where the item is assigned to a plant or vehicle, the item
‘follows’ the plant / vehicle
Principle 3- Where physical location, direct assignment and a specific
proportional usage method is not available for asset allocation, an equitable
Page 2 of 3 v5.0
Page 26 of 95See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.