                                          the water supply (other than
                                          where the water supply is in a
                                          swimming pool or dam).
Flood Hazards                        AO16.1                                 AO16.1-16.2 - Not Applicable
PO16                                 Where the development is located
                                                                            The building is not located in a
Development is designed and          in the Flood Hazard Area as shown
                                                                            Flood Hazard Area.
sited to ensure risk to people and   on Flood Hazard Overlay Map in
property from flooding is avoided    Schedule 2, the finished floor level
or minimised.                        is at least 300mm above the DFE

                                     Or

                                     AO16.2
                                     Where the DFE has not been model
                                     led for the area, the finished floor
                                     level of habitable rooms is at least
                                     500 millimetres
                                     above the highest recorded flood.


Major Electricity Infrastructure &   AO18.1                                 AO18.1 - Complies
Substations                          Development including any
                                                                            The building is not within
PO18                                 sensitive land uses is at least:
                                                                            proximity of major electricity
Development is sufficiently
                                                                            infrastructure.
separated from major electricity     a) 50 metres from a
infrastructure and substations to       transmission substation;
minimise the likelihood of
nuisance or complaint.               b) 10 metres from any
                                        other substation; and

                                     c) 30 metres from a transmission
                                        line easement.

                                     AO18.2                                 AO18.2. - Complies
                                     Habitable buildings are not located
                                     within an easement for a               The proposal is not located near
                                     distribution line.                     an easement for a distribution
                                                                            line.

Landslide Hazard Area                AO22.1                                 AO22.1 - AO22.4 - Complies
PO22                                 Development, including
                                                                            The dwelling is located outside
Development maintains the            associated access, is not located on
                                                                            of mapped Landslide Hazard
safety of people, property and       land identified as a landslide
                                                                            Areas.
hazardous materials stored in        hazard area on a Landslide Hazard
bulk from the risk of landslide      Overlay Map.

                                     AO22.2
                                     Development, including
                                     associated access, is located
                                     outside moderate, high and very
                                     high landslide hazard areas and
                                     areas with 15% slope or greater, as
                                     determined by a site-specific slope-
                                     analysis.

                                     Editor's Note—A site- specific
                                     geotechnical assessment may be

                                                                                                  Page 15 of 19
Log in to download the original file

Town Planning Assessment Report.pdf · 2.0 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.