Decision Notice - Minor Change - MCU21 0002 01 [As Published] · MCU21/0002.01
20. A Certificate of Completion from the Northern SEQ Distributor–Retailer Authority (Unitywater)
must be submitted to Council that certifies an underground connection to reticulated water
and sewerage has been provided to the development site.
ENGINEERING
External Works
21. Vision Ct must be upgraded for the length of its frontage to the subject site. The works must
be undertaken in accordance with the subject approval and must include in particular, the
construction of a pedestrian footpath in accordance with the conditions of this Decision Notice
Site Access and Driveways
22. A sealed access driveway must be provided from Vision Ct to all parking and manoeuvring
areas of the development. The works must be undertaken generally in accordance with the
approved plans.
Car Parking
23. A minimum of 17 car parking spaces must be provided and marked on the site and made
available and accessible at all times while the use is open for business. The works must
include in particular:
a. 7 staff parking spaces within the total, which are clearly marked for that purpose
b. Provision of vandal resistant public lighting with intensities to satisfy the requirements
of Australian Standard AS1158: Public Lighting Code;
c. 1 disabled parking space/s within the total
d. dimensions, crossfalls and gradients in accordance with Australian Standard
AS/NZS2890.1:2004 Parking Facilities
24. All car parking areas and access driveways must be maintained exclusively for vehicle
parking and manoeuvring and kept in a tidy and safe condition at all times.
25. Directional signage must be provided to direct visitors and customers to the car parking
spaces provided on site.
Service Vehicles
26. Service vehicle parking, manoeuvring and standing spaces must be provided on the site.
The works must be undertaken in accordance with the conditions of this Decision Notice and
must include in particular one 12 metres x 3.6 metres loading bay.
Pedestrian and Bicycle Facilities
27. Pedestrian and bicycle facilities must be provided for the development. The works must be
undertaken in accordance with the conditions of this Decision Notice and must include in
particular:
a. 2 metre wide concrete footpath within the road verge, extending from the eastern edge
of the proposed driveway to the prolongation of the subject property’s eastern
boundary;
b. A total of 7 bicycle parking spaces.
Stormwater Drainage
28. The site must be provided with a stormwater drainage system connecting to a lawful point of
discharge. The works must be undertaken in accordance with the conditions of this Decision
Notice and must include in particular, the works shown on the Approved Plans.
Services
29. Unless otherwise stipulated by telecommunications legislation at the time of construction, the
development must be provided with all necessary conduits, pits and pipes to accommodate
the future connection of optic fibre technology telecommunications.
Page 4 of 14
Document Set ID: 22542722
Version: 4, Version Date: 16/08/2023
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Decision Notice - Minor Change - MCU21 0002 01 [As Published].pdfRelated documentApplication case desk ↗
About this file
- File size
- 194 KB (small file)
- File type
No other editions are linked here.