NOOSA COUNCIL IDAS Development Application Decision Notice 7 of 12
The detailed deigns shall then be submitted to ENERGEX for approval and a copy of their approval
submitted to Council in conjunction with a “Certificate of Electricity Supply for Proposed Subdivisions”
(prepared by an approved ENERGEX Electrical Design Consultant) prior to Council endorsing the Plan of
Survey.
Any agreement with ENERGEX or an approved ENERGEX Electrical Design Consultant shall be wholly at
the applicant’s expense and shall not entail a financial encumbrance on future purchasers of the proposed
lots.
Street lighting and pathway lighting throughout the subdivision shall have a high energy efficient rating to
the reasonable satisfaction of Council and shall generally be provided in accordance with the principles of
Council’s Engineering Design Standards, section 11.3.3.
46. The requirements for TELECOMMUNICATION services shall be satisfied in relation to the provision of
new telephone services to the proposed lots. In this regard written confirmation from an approved
telecommunication agency shall be submitted to the Council prior to Council endorsing the Plan of Survey
Stormwater
47. The maximum discharge of stormwater drainage allowable to Council's street gutter at any one location is
25 litres/second.
48. Stormwater that is to be disposed of on site shall be disposed of in such a manner so as to cause no
scour or damage to adjoining properties to the reasonable satisfaction of the Manager - Land
Development. A Development Permit for Building Works shall not be granted until a Development Permit
for Operational Works has been issued in regard to the drainage scheme.
49. The stormwater discharge from the site shall be designed such that there is no net increase in the rate of
discharge as a result of the development for storm events up to 100 year ARI.
50. The design plans are to show how stormwater runoff within and from the site is to be controlled both
during construction and permanently. The plans are to indicate measures to be taken to prevent erosion
and the export of sediment from the site and will embrace the principles set out in the Institution of
Engineers Australia Engineering Guidelines for Queensland Soil Erosion and Sediment Control, June
1996. Designs shall also incorporate the principle of “no net increase” in nutrients and other pollutants
from the developed site. This may require the provision of a drainage system that allows first flush (first
12mm of rainfall) to be collected and treated prior to release into the downstream drainage system.
51. All site drainage shall be by means of gravity systems.
Survey
52. Where existing fences are within existing or proposed road reserves, they shall be removed and re-
erected on the correct alignment. Any building or other structure erected within a road reserve shall be
removed.
Prior to endorsement of the Plan of Survey, the Applicant shall submit to Council a certification of
compliance from a registered Surveyor.
AOP2 c:\docume~1\aop2\locals~1\temp\bcl technologies\easypdf 5\@bcl@10092b60\@[email protected]
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
NEGOTIATED Decision Notice [As Published]Related documentApplication case desk ↗
About this file
- File size
- 83 KB (small file)
- File type
No other editions are linked here.