Original source · versioned page text
Delegated Report - Code - Planning RAL23 0022 7 OPW23 0187 [As Published]
Approved Plans
3. Development authorised by this approval must be undertaken generally in accordance with
the Approved Plans listed in the table below.
Plan No. Rev. Plan/Document Name Date
C110 D Proposed Subdivision Layout Plan 07.02.2024
prepared by Auxilium Consulting
4. All lot numbering on the subdivision plan to be submitted to Council for compliance
assessment must remain as shown on the Approved Plans.
Property Access and Driveways
5. A sealed access driveway must be provided from the existing formation in Overlander
Avenue to each lot. The works must be generally in accordance with drawing number C300
Revision D prepared by Auxilium Consulting dated 7 February 2024 and must include in
particular:
a. driveway crossovers in accordance with Council standard drawings RS-049 and RS-
050 and any associated addendum, and
b. the access driveway to Lot 2 must extend for the full length of the access handle,
including underground service conduits for all utility services.
Stormwater Drainage
6. Stormwater runoff from the development must be discharged to the kerb and channel in
Overlander Avenue and/or disposed of on-site without causing scour or damage to the
subject site or any adjoining property.
Services
7. Reticulated electricity and telecommunication services must be provided to each lot in
accordance with the standards and requirements of the relevant service provider. The
services within the site must be provided underground.
8. Unless otherwise stipulated by telecommunications legislation at the time of construction, the
development must be provided with all necessary conduits, pits and pipes to accommodate
the future connection of optic fibre technology telecommunications.
9. Certification must be submitted to Council from all relevant service providers (Energex, NBN
and Unitywater) which certifies that the development has met the requirements of this
Decision Notice and all applicable legislation at the time of construction.
Easements
10. Unless otherwise agreed in writing by the relevant service provider, any public or third party
infrastructure located on the subject site must be placed within an easement registered
against the title of the property.
11. All easements must be designed in accordance with the planning scheme and granted at no
cost to the Grantee. Where the Grantee is Council or a service authority, the easement
documentation must be in accordance with the Grantee’s standard easement terms. Draft
easement documentation must be submitted to Council for endorsement.
12. All works must be kept clear of any existing or proposed easements on the subject land,
unless agreed otherwise in writing by the Grantee.
Earthworks and Retaining Walls
13. All earthworks and associated retaining structures/batters must be contained entirely within
the subject site unless written permission from the respective landowner(s) is provided to
Council. All earthworks must be undertaken in accordance with the provisions of Australian
Standard AS3798: Guidelines on Earthworks for Commercial and Residential Developments.
Page 7 of 14
Document Set ID: 22849946
Version: 6, Version Date: 25/03/2024
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.