Delegated Report - Code - Planning RAL23 0022 7 OPW23 0187 [As Published]
Development Permit for Operational Works
14. Development undertaken in accordance with this approval must generally comply with the
approved plans of development. The approved plans are listed in the following table unless
otherwise amended by these conditions.
Plan No. Rev. Plan/Document Name Date
C002 D General Notes prepared by Auxilium 7.02.2024
Consulting
C100 D Overall Layout Plan prepared by 7.02.2024
Auxilium Consulting
C200 D Earthworks Layout Plan prepared by 7.02.2024
Auxilium Consulting
C300 D Siteworks and Services Layout Plan 7.02.2024
prepared by Auxilium Consulting
C301 D Driveway Longitudinal Section 7.02.2024
prepared by Auxilium Consulting
C302 D Driveway Cross Sections prepared by 7.02.2024
Auxilium Consulting
CURRENCY PERIOD
15. The Currency Period for this development approval lapses if the development has not
substantially started by 22 March 2026, unless an application to extend the currency period
is approved by Council.
PRIOR TO COMMENCEMENT OF WORKS
Engineering
16. Tree protection fencing must be installed under the supervision of the Project Arborist. (Refer
to Retention of Existing Trees Conditions).
17. All necessary approvals from external service providers (eg Unitywater) and external parties
on which the development works are proposed have been obtained and a copy supplied to
Council.
18. A condition report including photographs of the frontage of the site must be completed and
submitted to Council at the prestart meeting / prior to any works commencing.
19. Certificates demonstrating currency of public liability insurance and works insurance covering
the works must be submitted to Council prior to the prestart meeting.
20. Council must be contacted at least 5 working days prior to any works commencing to
organise a prestart. The contact number to arrange a pre-start meeting is 5329 6500. The
pre-start meeting must include the relevant parties for the following aspects of the works:
a. Civil engineering works;
b. Landscape works;
c. Erosion and sediment control works;
d. Other relevant parties
21. A Construction Management Plan must be submitted to Council prior to the pre-start meeting
and must specifically address the following:
a. Traffic Management during all aspects of the construct phase including:
Page 8 of 14
Document Set ID: 22849946
Version: 6, Version Date: 25/03/2024
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.