Waste Management Plan
Plans and drawings: the text below has words only, no drawings.
Very large file (33.7 MB): may take a few minutes to open.
2.5. RCV Arrangements and Bin Servicing Areas RCV’s will enter the site from the loading dock driveway crossover provided on Level 1 off Serenity Close, perform a single reversing manoeuvring on site into the loading bays on basement level and exit the site once the collection has been performed. All refuse will be collected directly from the refuse room adjacent to the loading bays. Once the bins have been serviced, they will be returned to the bin room for use. The type of vehicles allocated, and demand will be subject to final design and potential selection of volume reduction equipment. The collection days and frequency form a part of the contract between building management and the preferred contractor and is agreed to based on both the building and contractors’ business requirements. Figure 2.4 below shows the swept paths for an LRV, RCV’s this size and smaller are readily available across the waste collection industry. As the development is currently at the assessment process no contract has been entered into. Any contractor letter request from Council should be conditioned to be provided prior to the commencement of operation at the construction finalisation stage. Further details on vehicle access and on-site manoeuvring can be found in the traffic report, with swept paths provided in Appendix A. Site: 3-7 Serenity Close, Noosa Heads 21 Reference: 22BRW0104
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.