Original source · versioned page text
Waste Management Plan
Plans and drawings: the text below has words only, no drawings.
Very large file (33.7 MB): may take a few minutes to open.
3.2.1. Safety Transferring refuse bins and using refuse management equipment are considered hazardous tasks. Therefore, contractors must ensure that a full risk assessment of equipment, surfaces and related gradients is complete. The contractor must provide procedural documentation to appropriate personnel prior to delivery of equipment and occupancy of the development. Table 3.4: Safety Checklist Objectives Checked Remarks Abiding by all relevant occupational health and safety legislation, regulations and guidelines to ensure site safety for residents, visitors, staff and contractors. Assessment of any manual handling risks and preparation of a manual handling control plan for waste and bin transfers. Provision of equipment manuals, training, health and safety procedures, risk assessments and personal protective equipment to staff / contractors in order to control hazards associated with all waste management activities. 3.2.2. Signage All receptacles, bins and other refuse management equipment will have adequate signage. Standard signage will be provided in and around waste collection and storage areas and will be colour coded in accordance with AS 4123.7–2006 Mobile waste containers (see Appendix C). Signage will be installed to promote best practice in recycling and stream separation Table 3.5: Signage Checklist Objectives Checked Remarks Ensuring compliance of signage with government local council Use signage provided by Noosa Council if regulations. applicable. Ensuring that labelling on bins, refuse room etc. is appropriate and clear and easy to read and updated if required. 3.2.3. Cleaning and Maintenance Regular cleaning and maintenance of all refuse management facilities is important to maintain a safe and hygienic environment for residents, visitors, staff and contractors. Table 3.6: Cleaning and Maintenance Checklist Objectives Checked Remarks General cleaning of all refuse holding and transfer areas Frequency depends on refuse generation and including building operation. • Refuse bins, rooms and storage areas • Refuse transfer areas including lifts and staircases • Any other refuse management equipment Coordination of specialised cleaning contractors as required. Maintenance and servicing of refuse management equipment Frequency depends on equipment and building as per schedule. operation. Coordination of specialised equipment contractors as required. Site: 3-7 Serenity Close, Noosa Heads 27 Reference: 22BRW0104
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.