Original source · versioned page text
Waste Management Plan
Plans and drawings: the text below has words only, no drawings.
Very large file (33.7 MB): may take a few minutes to open.
Monitoring and Review Regular monitoring and inspections of waste and related equipment and facilities from the development should be conducted by building management or designated staff for maintenance and sustainability. Waste composition audits are recommended on a routine (12 monthly) basis to identify potential improvements in the recycling processes taking place. Audits may be undertaken by external contractor or internally by visual inspection in on-site waste management handling activities. For example cleaners may observe contents of waste receptacles when decanting caddies in larger bins and recording results, this method is less accurate than a full audit but may be undertaken on an ongoing basis. Table 3.9: Monitoring and Review Checklist Objectives Checked Remarks Continual monitoring of equipment uses and scheduling to ensure best operational outcomes. Regular review of refuse management equipment and facilities such as bin volumes, refuse storage capacities and stormwater management arrangements. Routine waste composition audits. Site: 3-7 Serenity Close, Noosa Heads 29 Reference: 22BRW0104
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.