Maintenance of the bioretention basin will include:
Routine inspections of surface profile to identify areas of sediment buildup, scour and
erosion or clogging of the filter media;
Routine inspection of the overflow pits and under drains for blockages and litter buildup;
Removal of sediment where it is smothering the basin vegetation; and
Repair all basin damage due to scour or erosion by replacement of filter media and
vegetation.
A Bioretention Basin Maintenance Checklist is attached in Appendix 4.
Detailed maintenance techniques can be found in the Water By Design Maintaining Vegetated
Assets Guideline.
5.5 Construction Phase (Sediment and Erosion Control)
5.5.1 Intent of Erosion and Sediment Control Management Plan
To prevent stormwater contamination (of watercourses) and the release of contaminated
stormwater and wastewater by ensuring compliance with the Environmental Protection Act 1994
and Environmental Protection (Water) Policy 2009.
5.5.2 Implementation Strategy
Establish control measures and best practice approaches to prevent stormwater contamination
and minimise the risk and adverse effects of erosion and sedimentation. All Erosion and Sediment
Control measures must be designed, constructed and maintained in a manner that is
commensurate with the site’s erosion risk.
5.5.3 Erosion and Sediment Control Measures
Obtain a licence or approval to operate activities that are classed as environmental
relevant activities (i.e. they have the potential to cause environmental harm).
Implement and maintain appropriate control measures to prevent sediment leaden
wastewater and other potential pollutants such as oil, paint and wet concrete from entering
the stormwater system via stormwater drains and gullies. The control measures which
must be considered to be adopted are:
Limit site access during construction to minimise disruption to traffic
Install a temporary construction entry/exit sediment trap at all site accesses to
minimise mud and sediment from the site being tracked onto public road,
particularly during wet weather or when the site is muddy.
Install and maintain appropriate sediment fences around construction areas
Divert clean stormwater runoff, using catch drains, around construction
areas to existing or new stormwater drainage system.
Install sandbags and other pollution containment devices around
stormwater drains and any other locations where required to prevent
sediment entering the trunk stormwater system.
Excellence with Economy in Engineering 16
l:\7000-7999\7700-7799\7700\reports\18-07-19 stormwater management plan_issue d.docx
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.