5.5.6 Responsible Person Or Organisation
The contractor shall be responsible for the implementation and maintenance of the Erosion and
Sediment Control Measures.
5.5.7 Reporting / Review
Records such as licences, approvals, permits and inspection reports must be reviewed on a regular
basis (e.g. at least monthly) to ensure that legal compliance is met, complaints are reviewed and
systems are working to prevent contamination.
5.5.8 Corrective Actions
Perform clean-up of any spills immediately.
Any mud or sediment which is tracked onto public roads is to be immediately removed
using dry clean-up methods i.e. shovel and broom.
Remove or relocate any stockpiles of waste where there is a reasonable risk of erosion and
sedimentation.
Replace or repair sediment or pollution control devices if they are not maintained in good
working condition.
6 CONCLUSION
This Stormwater Management Plan demonstrates that under the proposed concept plan
stormwater quality and quantity treatment is achievable to the levels required by State Planning
Policy July 2017.
Detention will be provided in the form of a combined bioretention/detention basin located along
the Northern boundary of the site and a detention tank located under the main entry to the new
building. The combined bioretention/detention basin will provide stormwater treatment for the
proposed development.
The installation of detention and treatment on site will ensure that runoff conditions from the
developed site are consistent with the pre-developed scenario. Regular maintenance of the
detention and treatment systems will be undertaken to ensure that the systems are functioning as
designed and that the State Planning Policy and Noosa Council requirements are being met.
Any groundwater discharged from site will be tested and assessed for its levels of acidity and
treated as required to ensure that the pH is consistent with that of the downstream environment.
7 LIMITATIONS OF REPORT
MPN have prepared this report for the proposed Medical centre development at Hofmann Drive in
accordance with MPN’s proposal to Ribarja Property. This report is provided for the exclusive use
of the Ribarja Property for this specific project and its requirements. It should not be used or relied
upon by a third party and MPN accept no responsibility for the use of this report by any party other
than Ribarja Property.
Excellence with Economy in Engineering 18
l:\7000-7999\7700-7799\7700\reports\18-07-19 stormwater management plan_issue d.docx
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.