Original source · versioned page text
24-7-19 Attachment F Rev Stormwater Mgmt Plan
The original of this document is very large (22.6 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn18 July 2019
3.2 Topography and Existing Site Drainage
The site is clear of vegetation and can be described as vacant grassland.
A concrete access driveway within an easement runs from Hofmann Drive through the developed
lots to the South and connects back to Rene Street.
The driveway is considered the sites access point.
The site generally slopes from the North Western corner of the site towards the Eastern corner of
the site and the intersection of Hofmann Drive and Rene Street.
Stormwater runoff from the existing site sheet flows across to stormwater pits constructed as part
of the Masterplan subdivision.
A copy of a survey plan for the site prepared by Downes Group is attached in Appendix 2
4 SITE DATA
Site data has been obtained from the following sources of information:
Survey Data
Noosa Shire Council
Satellite Imagery
Relevant Reports
Dial Before You Dig (DBYD).
Excellence with Economy in Engineering 7
l:\7000-7999\7700-7799\7700\reports\18-07-19 stormwater management plan_issue d.docx
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.