24-7-19 Response to Council further info
Page 2 Item 8: Access to basement. Applicant’s Response to Item 8: Please refer to Attachment A which provides Lambert & Rehbein’s response. Item 13: Widen external loading zones. Applicant’s Response to Item 13: Please refer to Attachment A which provides Lambert & Rehbein’s response and ground floor plan in Attachment D which details loading zoned widened to 3.5 metres. Item 28: PASS and ASS Applicant’s Response to Item 28: Please refer to Attachment E and F for MPN Consulting’s response. The response notes that bulk excavation for the proposed basement will be less than 4m in depth from existing surface levels and that no ground water was observed during the geotechnical investigation. Item 31 &32: Stormwater- Provide traditional bioretention basin Applicant’s Response to Item 31 &32: Please refer to Attachments E, F,G, H and I for MPN Consulting’s response. The stormwater design for the project has been updated to include a bioretention basin for stormwater treatment instead of proprietary devices. The applicant considers that they have now responded to Council’s outstanding matters notice. The applicant therefore withdraws the notice stopping the current period. The decision making period therefore has recommenced and we request that your Council proceeds with its assessment of the application as soon as possible in accordance with the Planning Act 2016. Please contact our Sunshine Coast office if you require any further information and/or clarification. Yours faithfully, Nadine Gorton Senior Planner martoo consulting pty ltd
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.