Lot 10

 

 

 

 

ey,
Lot 8
wy, %,
ey
(o)*
Lot7 ®

Lot 6

 

 

AT SC1389563 - LIVE 11kV/LV
AND SERVICES. FAND EXCAVATE.

RESTORE SITE WFEN COMPLETED.

DANGER

 

ONLY AT THIS LOCATION.

 

USE BARRIER AND SIGNS.

 

  

 
  

 

 

 

 

 
 

 

DEVELOPERS SURVEYOR

1.

- NOTES

PROPOSED LOT 17 - S.E. CORNER NEXT TO

THE DRAINAGE RESERVE IS TO HAVE A MINIMIUM
2m x 2m TRUNCATION TO ALLOW FOR THE
INSTALLATION OF ELECTRICAL SERVICE PILLAR
CLEAR OF SWWATER AND S/WATER PITS.

THE TRUNCATED PROPERTY BOUNDARY LINE
OF VENTURE DRIVE AND PROJECT AVENUE IS
TO BE STAKED FOR NEW ELECTRICAL WORKS

 

INSTALLATION OF BORED CONDUITS

TO COMPLY WITH THE ELECTRICAL SAFETY ACT, BORED
CONDUITS SHALL BE INSTALLED AT A MINIMUM DEPTH

OF 900mm. AT EACH END, WHERE THE CONDUIT RISES
TOA DEPTH OF LESS THAN 900mm, A TRENCH SHALL

BE EXCAVATED AND PROTECTIVE COVERS AND MARKER
TAPE SHALL BE LAID ABOVE THE CONDUIT.

TO BE INSTALLED.

 

 
 

 

TUNNEL BORING SHALL BE REQUIRED AT
STN'S 248-28.

 

 

 

 

 

 

 

 

 

 

 

TELSTRA - NOTE

RELOCATION WORKS REQUIRED.
PROPOSED TO MOVE SMALL PIT TO
ALLOW FOR ELECTRICAL WORKS IN
FRONT OF PADMOUNT SC21257

 

 
 
 

    

 
    
    

 

 

 

 

DANGER

IN VENTURE DRIVE, EXISTING
MAJOR SERVICES IN ALL LOCATIONS.
CONFIRM AND POT HOLE BEFORE EXCAVATING.

 

  

DETAIL 'A'- SH

 
 
  

  

 

 

 

DRAINAGE
RESERVE

  

REINSTATE VERGE &
LANDSCAPE AS REQUIRED

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 
  
 
  

 

   

 

 
 
 

ELECTRICAL CONTRACTOR

The works detailed on this drawing shall be constructed in accordance with Robin Russell & Associates’
General Specification for Installation of Electricity Reticulation and Street Lighting - Issue ‘Y’.

CIVIL CONTRACTOR

The installation of all electrical conduits shall be supervised by the holder of an electrical work licence
- Electrical Safety Act 2002.
Energex conduits and transformer site retaining walls shalt be installed strictly in accordance with
Energex's specifications (see below). They will be inspected for compliance upon completion.
The civil contractor shail install enveloping conduits under retaining walls behind pillars - two 100mm
Conduits into each lot (one for Electricity, one for Tetstra), 600mm deep behind the pillar, near ground
level inside the lot
Relevant specifications in Energex's Underground Distribution Construction Manual are found at -
Section C1: Conduits
Section C2: Excavation
Section C3: Transformer Sites
These sections of the manual can be downloaded from the following Energex web site:
hitp:/Awww.energex.com.au/about_energex/asp/echnical_documents. asp
Civil engineers who have registered for access to the following RRA website may download extracts
from Energex's manual at
ittp-/Awww. robrus.com.au
The civil contractor shall ensure that all conduits have been installed before constructing retaining
wails, paths, driveways & water services. The civil contractor shall please inform the electrical
contractor of any ‘as constructed" departures from the civil design.

 

 

Care! Lighting of new or altered existing roads might not comply with specified standards
until new road lighting has been commissioned. The civil contractor shail ensure that
Necessary warming signs are installed and speed restrictions are applied if necessary.

 

 

 

 

 

 

 

 
  
  

   

 

 

 

 

 

 

 

  

 

 

 

   

 

 

 

 

  
 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

   

 

 

 

 

 

 

 

 

 

 

 

 

 

ON-SITE SERVICES CHECKS

Robin Russell & Associates gives no warranty regarding the presence or location of buried services,
including newly-installed services. "As Constructed” locations may differ from what is drawn on this
works plan. Contractors shall be responsible to identify and locate all buried services. Initial
identification can be obtained from:

Dial Before You Dig Service

Telephone 1100

Fax 1300 652 077

On-line enquiries can be made at:

http:/Awww.1100.com.au.
Having determined which services may be present, on-site locations should then be arranged with
relevant service authorities.
Sewerage and water plans for the subdivision may be obtained on request from the Superintendent.

INSTALLATION OF TELECOMMUNICATIONS CONDUITS BY TELSTRA

Telstra's contractor will install telecommunications conduits in shared trenches and other excavations
provided oy the electrica: contractor. in commercial subd visions. or where more than 2xP 100 conauits
are required the conduits may not be instalied aove Energex conduits. They shall be laid in a
separate trench on the standara communications alignment specified
Contractors shail novfy Telstra's contractor

* one week before road crossing trenches will be open

* — two days before footpath trenches will be cpen
Teistra’s contractors are

south of Brisbane River Silcar Communications

 

LEGEND: ELECTRICAL

 

—-—— EXISTING UNDERGROUND CABLE
PROPOSED UNDERGROUND CABLE
PROPOSED NBN CONDUIT ON COMMS ALIGNMENT
COMMS CONDUIT IN SHARED TRENCH
BORED CONDUIT

GAS IN SHARED TRENCH

STATION NUMBER

PADMOUNT TRANSFORMER

PROPOSED POLE TRANSFORMER

METER BOX/ LV SWITCHBOARD

PROPOSED SERVICE PILLAR

EXISTING SERVICE PILLAR

FUTURE SERVICE PILLAR

EXISTING LINK PILLAR

PROPOSED C&i PILLAR

EXISTING OVERHEAD ELECTRICITY MAINS
PROPOSED OVERHEAD ELECTRICITY MAINS
HV POLE

HV +LV POLE

LV or STREET LIGHT POLE

PROPOSED STREET LIGHT

EXISTING STREET LIGHT

FUTURE UNDERGROUND STREET LIGHT
RECOVER STREET LIGHT

EARTH

EXISTING RATE 3 STREETLIGHT CABLE
PROPOSED RATE 3 STREETLIGHT CABLE
EXISTING RATE 3 STREET LIGHT
PROPOSED RATE 3 STREET LIGHT
EXISTING CONSUMERS OVERHEAD CABLE
PROPOSED CONSUMERS OVERHEAD CABLE
EXISTING CONSUMERS UNDERGROUND CABLE
PROPOSED CONSUMERS UNDERGROUND CABLE
Lg PROPOSED CONSUMERS SWITCHBOARD

o EXISTING CABLE

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Lot 12 elsewhere Service Stream Commun cations PROPOSED CABLE
e
I
| ) BIKE PATH CLEARANCES o 340mm HD CONDUIT
MOLY * . . . . " . 5 woe
¢ Xs} Lot 201 Lot 16 ‘Austroads Guide to Road Design Part 6A: Pedestrian & Cyclist Paths" specifies a minimum
REINSTATE VERGE AS | | Lot 14 / . clearance of 0.5m between a bike path and any obstacle. in order to achieve specified road © 80/100mm LD CONDUIT
REQUIRED CAUTION 4 Ooo” ots \ I path lighting within the specified verge, it has nat been possible to satisfy that requirement. © 100mm WHITE ENERGEX COMMS. CONDUIT
RECOVER LIVE LV END. / ] Lot 10 @® 125mm LD CONDUIT
eee tot TREE PROTECTION ZONES TREE PROTECTION ZONE (TPZ) @ _CABLEMARKER POST
Oo I . . . .
unwed Lot 22 The Electrical Contractor must avoid any trenching, boring, p A _""ENERGEX ELECTRIC CABLE" MARKER PLATE
9 35 01004619 Lot 12 or disturbance of earth inside any area covered by a 4 2
& O0e™™ Tree Protection Zone (TPZ) within the extent of works for this foo
H T project Any exceptions ‘e ts must be approved wing by \ UNDERGROUND CABLE CERTIFICATION
R le projects’ Tree Arborist or Landscape Architect and in . i
B C Xe Conjunction with all Local Authority's development approvals. All cables detailed on this drawing have been checked using the
y FUTURE STAGE 2 Lot 10 ©; cable locator described below and are, according to measurements
R zai SNe Refer AS 4970-2009 ‘Protection of Trees on Development Sites' taken, on the correct alignment and at correct depths below the
H / Lot 24 finished level, except as marked up. Alignments are subject to the
4 / NOTES accuracy of survey pegs present at the time of measurement.
/ 4. DANGER - EXISTING MAJOR TELSTRA AND SERVICE IN ALL AREAS.
LOT1 CHECK ALL SERVICES ONSITE AND HAND LOCATE AND IDENTIFY. Make: Model:
U71345 2. EXTRA WIDTH AND DEPTH TRENCHING MAY BE REQUIRED TO ACCOMMODATE Serial No: Date Cables Checked’)
‘ TELSTRA CONDUITS - LOCATIONS SUBJECT TO CONFIRMATION BY TELSTRA. Name of Person Who Conducted Checks
3. ALTERATIONS TO EXISTING SERVICES - NOTIFY CUSTOMERS OF PROPOSED ame oF rerson Wvno Wonducte! Ss:
Lot 8 5.0m DATE/TIME OF INTERRUPTION TO SUPPLY. Certified (signature of checker):
foe 6.0m
4, NOTE - SOME NON STANDARD ALIGNMENT AND BORED CONDUIT REQUIRED Phone No. of checker:
ON VENTURE DRIVE TO AVOID EXISTING SERVICES, LV CABLES AND VEGETATION.
& e 5. TELSTRA TO BE ON A SEPARATE ALIGNMENT. ROAD LIGHTING CERTIFICATE
tk ROCK WALL ON BOUNDARY a < NO JOINT USE SERVICES TRENCH IN COMMERCIAL/INDUSTRIAL SUBDIVISIONS. Within the bounds ofthis tis ood lghting design is certied to
Oo oS estate, certified
+ 6. DEVELOPERS SURVEYOR TO STAKE LOCATIONS AS PER NOTES ON MAIN PLAN. comply generally with the nominated categories of AS1158.1-1986,
s ASINZS1158.1.1:2005 and/or AS/NZS1158.3.1:2005 for luminaires
z & 7. PROPOSED RING MAIN UNIT LOCATION. :
3 i REFER TO NOTES ON PLANS AND SCHEDULES. and lamps supplied under Energex contract C10227.
2 VENTURE DRIVE EXTENSION AND VISION COURT -
TELSTRA - NOTE nerves
L -
SEPERATE TRENCHING IS REQUIRED
FOR TELSTRA CONCUITS IN
COMMERCIAL INDUSTRIAL SUBDIVISIONS ROAD LIGHTING MAINTENANCE SCHEDULE
This design assumes maintenance factors of 0.7 for minor road
LOT 2 lighting and 0.75 for major road lighting. These maintenance factors
are based on the following nominal maintenance schedule, which
might not necessarily be adopted by Energex.
1. Lamps shail be replaced at 36-month intervals.
CONSTRUCTION CONTACTS . ep ‘ .
Transformer site to be constructed by the Electrical Contractor, for new square series. TELECOMMUNICATIONS INFRASTRUCTURE 2. Atthat fime, luminaires shall be cleaned, inspected & maintained.
ELECTRICAL ENGINEER PLAN VIEW -20m 0 20 40 60m For all construction details refer to Energex Underground Distribution Construction Manual - Section 4. 3. Vegetation shall be kept clear of streetlights 7
ROBIN RUSSELL & ASSOCIATES PTY LTD SCALE 1-100 a The Electrical Contractor shall arrange for a soil compaction (est to be cartied out on the transformer site and CONDUITS & PITS | to be designed by: Telstra's contractor 4. Inspection patrols and spot lamp replacement shall maintain
DESIGNER : 1 1000 (At - NOT REDUCED) provide Robin Russell and Associates with a written report of the results. If the result is: to be installed by: Telstra's contractor service availabilty at not less than 95%. ;
ANTHONY HOBBS ph: 0499 999515 : greater than 50 kPa then a concrete base stab shall be supplied and installed by the Electrical Contractor. to be owned by: 5. Luminaires and lamps shalt be replaced with exact equivalents.
CONSTRUCTION MANAGER . less than ‘ot kPa then the Becta Contractor shall provide a pier foundation in line with the Energex TELECOMMUNICATIONS INFRASTRUCTURE to be provided by: ¢el Ss tr a
ground Construction Manual. a LZ . y
SHANE HYDE pit 0419 021772 The Civil Engineer and Civil Contractor shall ensure the site is level & prepared with retaining walls (required) & = [fT eteesssnnsnonteet ttrranttinsettvnss teens
CIVIL ENGINEER safety fence (if required) in line with the requirements of the Energex Underground Distribution Construction Manual . Telstra AFR: - Robin Russell RPEQ 1546
TOD NOOSA CONSULTING ENGINEERS
— SOURCE DOCUMENTS SITE INFORMATION
SURVEYOR
TOTAL NUMBER OF LOTS
MURRAY & ASSOCIATES PTY LTD PROPOSED $C2069511 ( STN 2) - VISION COURT CREATOR DRAWING DWG. NO. REV. NO. | DATE o
JOHN CAMPBELL ph: 5441 2188 SCALE 1:200 (AT Al SIZE) TOD NOOSA CONSULTING ENGINEERS | PROPOSED WATER 06583/21 W 26/3/2008 ERTY DESCRIPTION
TELSTRA CONTRACTOR TOD NOOSA CONSULTING ENGINEERS | BASE ACAD..06583 EMAR T7ER2014 LOTS 1, 9-17 cancelling P/O LOT 81 ON SP211687
GM TOD NOOSA CONSULTING ENGINEERS | ROADWORKS & DRAINAGE | - 6583-54 1773/2014
BOB TANNER ph: 0477 708028
DATE | REV | REVISION APP. | DATE | REV | REVISION APP. | CURRENT REVISION CHANGES: i RC TION SWP47.1 DESIGNED D. BUCKENHAM DESCRIPTION LOCATION DRAWING No.
s SUBDIVISION ELECTRICAL SERVICES
12608 | A _| ORIGINAL ISSUE RR Robin ZAG tre et wave, [COUN | SCRE. DRAWN —_| N OWENS ELECTRICITY RETICULATION GATEWAY RISE - NOOSAVILLE STAGE 1 -
26.6.08 APPROVED RR. + 0 4058 4 ‘ ROBIN RUSSELL NOOSAVI LLE
R u Ss se | | Tet (07) 3672 5555 3 COUNCIL REF | 2007/1626 APPROVED BY | poco 1546
25.3.14 c FOR TENDER RR. Fax (07) 3672 5566 . - CUENT ENERGEX PROJECT No. SHEET No.
& ASSOCIATES PTY. LTD. Ema r@vobrus com au ceateriee UBD REF Me Gd Gye VV
CONSULTING ENGINEERS - ELECTRICAL ABN. 78.010 589 661 “ en * = GATEWAY RISE PTY LTD THIS DOCUMENT IS COPYRIGHT AND THE PROPERTY OF ROBIN RUSSELL & ASSOCIATES PTY LTD $01 04679 1 OF 3
. DWT REV V26 - 20140225 DATE 25/03/2014 AND MUST NOT BE RETAINED, COPIED OR USED WITHOUT AUTHORITY. A1

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Used in these records

About this file

File size
981 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

OPW14_0178 - Application for Operational Works - Electrical Reticulation & Street lighting (covering letter & plans) - 50 Gateway Dr, Noosaville- Stage 1.pdf · 981 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.