Council archive · source document
2ND RFI - Attachment 7A - Bushfire Hazard Assessment · MCU22/0118
Very large file (16.9 MB): the original may take a few minutes to open or download. The page text below is quick to read.
Original PDF page 10, section 1. The text section number identifies this passage in the reader.
-8-
Vegetation Management – Other areas be updated to include the Eco-Cabins
and all existing actions and
a) The Concept Rehabilitation Plan responsibilities are to be adopted for the
specifies the planting regime, Eco-cabins with respect to vegetation
management and species pallet for and structural fires.
each rehabilitation zones within the
development areas. Building Compliance
b) Zone 1 is the area to rehabilitated as a
wetland to compliment the adjacent a) Building Compliance under the National
wetland areas. This is considered to be Construction Code is to be conditioned
part of the existing vegetation by the certified Building Certifier.
assemblage and as such will not result b) We note QFES will be required to
in an increase in area of this relatively advise on fire hydrants and structural
small stand within the development site. fire mitigation issues for the proposed
c) Zone 2 covers the area which will form a Eco-cabin structures.
vegetative screen between the southern
Eco-cabins and Noosa Drive. As this
area is too narrow and is separated
from any area of acknowledged bushfire
hazard to present a bushfire risk to the
development proposal.
d) Zone 3 covers the proposed detention
basin and the basin will be vegetated
with sedges and water tolerant grasses.
This is an artificial area and as such
regular maintenance will be required to
ensure weeds and other wetland
sedges such as Typha orientalis and
Phragmites australis do not gain a foot-
hold in the basin and increase the
average height of sedges within this
area.
e) Zone 5 – Balance area amongst cabins
area is to be in accordance with the
Concept Rehabilitation Plan (Gondwana
Ecology Group).
f) The Zone 5 area is to be managed on a
day-to-day basis by the RACV Noosa
Resort to maintain the plantings /
rehabilitation in a viable condition and to
ensure that no vegetation would
become a bushfire risk to any of the
Eco-cabins or boardwalk structures.
Emergency Response - Bushfire
a) The current Emergency Response Plan
covering the RACV Noosa Resort is to
RFA18-048 – 22 - RACV NOOSA RESORT – ECO-CABINS - BUSHFIRE HAZARD ASSESSMENT AND MITIGATION PLAN
ROB FRIEND & ASSOCIATES PTY LTD 18TH OF JULY 2023
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
2ND RFI - Attachment 7A - Bushfire Hazard Assessment.pdfRelated documentApplication case desk ↗
About this file
- File size
- 16.9 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.