-7-
purpose of this development to be an v. between Cabins 8 / 9 and 10 / 11,
area of Medium bushfire hazard. and
4. However, given the width of potential vi. between Cabins 10 / 11 and 12 / 13
exposure is no greater than 20 metres, c) All hydrant stand pipes are located and
the bushfire risk is considered to be low designed in accordance with the
Vehicle Access Guidelines for
Bushfire Mitigation Residential, Commercial and Industrial
Lots (QFES, 1015).
specifications
d) A fire hose with a 20-metre-long hose be
located at each Eco-Cabin in addition to
The following bushfire mitigation
the proposed hydrant stand pipes.
specifications are provided to ensure the
e) The fire hose is to be connect to the
development adequately protected from a
Resort’s reticulated water supply.
vegetation fire that may threaten the
f) All piping for the hydrant stand pipes
development from the Reserve land to the
and Eco-cabins fire hoses could be
north.
located under the boardwalk. However
this is to be specified in the detailed
Access
engineering design drawings and
specifications for the Building and
a) Access for Emergency Service, Urban
Plumbing Certifiers.
Fire Brigade is provided to the car
parking area and be in accordance with
Asset Protection Zone
the QFES Fire Hydrant and Vehicle
Access Guidelines for Residential,
a) Eco-cabin 1 and 2 & 3 are to be
Commercial and Industrial Lots (QFES,
separated from the potentially
2015).
hazardous vegetation to the north by a
10 metres wide Asset Protection Zone
Water sources
(APZ).
b) The APZ is to consist of a 10-metre-
a) The development is connected to the
wide management zone which will be
Council reticulated water supply.
planted with low groundcovers and low
b) While the location and specification of
and prostrate shrub species in
hydrant stand pipes would normally to
accordance with the Concept
designed and identified in the detailed
Rehabilitation Plan (Gondwana Ecology
engineering drawings, it would be
Group, 2023)(see Figure 11).
reasonable to hydrant stand pipes to be
c) Due to the current level of weed
located in locations where they can be
dominance within the APZ area (Zone 4
accessed for both a vegetation fire
in the Concept Rehabilitation Plan),
and/or a structural fire within the
maintenance of Zone 4 is to be a year-
development site. Therefore, it is
round exercise as a vegetation fire may
recommended that the following
involve the reserve land to the north at
locations be considered in the detailed
any time during the year and particularly
design process: -
in periods of low rainfall and higher and
i. At the entrance near the boardwalk
average temperatures. However, once
to Cabins 14 & 15.
the planted vegetation within Zone 4 has
ii. between Cabin 1 and Cabins 2 / 3
reached a level of maturity and cover
iii. near Cabins 4 / 5,
over the area that maintenance can be
iv. at Cabins 6 / 7
reduced to a as needs basis.
RFA18-048 – 22 - RACV NOOSA RESORT – ECO-CABINS - BUSHFIRE HAZARD ASSESSMENT AND MITIGATION PLAN
ROB FRIEND & ASSOCIATES PTY LTD 18TH OF JULY 2023
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
2ND RFI - Attachment 7A - Bushfire Hazard Assessment.pdfRelated documentApplication case desk ↗
About this file
- File size
- 16.9 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.