Skip to the record
For the highest quality transcripts.

Council archive · source document

2ND RFI - Attachment 7A - Bushfire Hazard Assessment · MCU22/0118

of 38

Text shows just the words. Original shows the document exactly as it was published.

Very large file (16.9 MB): the original may take a few minutes to open or download. The page text below is quick to read.

Original PDF page 9, section 1. The text section number identifies this passage in the reader.

                                                -7-


   purpose of this development to be an                  v. between Cabins 8 / 9 and 10 / 11,
   area of Medium bushfire hazard.                            and
4. However, given the width of potential                 vi. between Cabins 10 / 11 and 12 / 13
   exposure is no greater than 20 metres,             c) All hydrant stand pipes are located and
   the bushfire risk is considered to be low             designed in accordance with the
                                                         Vehicle Access Guidelines for
Bushfire Mitigation                                      Residential, Commercial and Industrial
                                                         Lots (QFES, 1015).
specifications
                                                      d) A fire hose with a 20-metre-long hose be
                                                         located at each Eco-Cabin in addition to
The following bushfire mitigation
                                                         the proposed hydrant stand pipes.
specifications are provided to ensure the
                                                      e) The fire hose is to be connect to the
development adequately protected from a
                                                         Resort’s reticulated water supply.
vegetation fire that may threaten the
                                                      f) All piping for the hydrant stand pipes
development from the Reserve land to the
                                                         and Eco-cabins fire hoses could be
north.
                                                         located under the boardwalk. However
                                                         this is to be specified in the detailed
Access
                                                         engineering design drawings and
                                                         specifications for the Building and
a) Access for Emergency Service, Urban
                                                         Plumbing Certifiers.
   Fire Brigade is provided to the car
   parking area and be in accordance with
                                                      Asset Protection Zone
   the QFES Fire Hydrant and Vehicle
   Access Guidelines for Residential,
                                                      a) Eco-cabin 1 and 2 & 3 are to be
   Commercial and Industrial Lots (QFES,
                                                         separated from the potentially
   2015).
                                                         hazardous vegetation to the north by a
                                                         10 metres wide Asset Protection Zone
Water sources
                                                         (APZ).
                                                      b) The APZ is to consist of a 10-metre-
a) The development is connected to the
                                                         wide management zone which will be
   Council reticulated water supply.
                                                         planted with low groundcovers and low
b) While the location and specification of
                                                         and prostrate shrub species in
   hydrant stand pipes would normally to
                                                         accordance with the Concept
   designed and identified in the detailed
                                                         Rehabilitation Plan (Gondwana Ecology
   engineering drawings, it would be
                                                         Group, 2023)(see Figure 11).
   reasonable to hydrant stand pipes to be
                                                      c) Due to the current level of weed
   located in locations where they can be
                                                         dominance within the APZ area (Zone 4
   accessed for both a vegetation fire
                                                         in the Concept Rehabilitation Plan),
   and/or a structural fire within the
                                                         maintenance of Zone 4 is to be a year-
   development site. Therefore, it is
                                                         round exercise as a vegetation fire may
   recommended that the following
                                                         involve the reserve land to the north at
   locations be considered in the detailed
                                                         any time during the year and particularly
   design process: -
                                                         in periods of low rainfall and higher and
   i. At the entrance near the boardwalk
                                                         average temperatures. However, once
        to Cabins 14 & 15.
                                                         the planted vegetation within Zone 4 has
   ii. between Cabin 1 and Cabins 2 / 3
                                                         reached a level of maturity and cover
   iii. near Cabins 4 / 5,
                                                         over the area that maintenance can be
   iv. at Cabins 6 / 7
                                                         reduced to a as needs basis.
   RFA18-048 – 22 - RACV NOOSA RESORT – ECO-CABINS - BUSHFIRE HAZARD ASSESSMENT AND MITIGATION PLAN

ROB FRIEND & ASSOCIATES PTY LTD                                                     18TH OF JULY 2023

Used in these records

About this file

File size
16.9 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

2ND RFI - Attachment 7A - Bushfire Hazard Assessment.pdf · 16.9 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.