Skip to the record
The gold standard in government transparency.

Council archive · source document

Attachment 13- Amended Flood Study MCU12/0208

of 130

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (37.1 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.

Original PDF page 106, section 1. The text section number identifies this passage in the reader.

Design Events
      1.    100 Year ARI Local                                             7. 1 Year ARI Local                       13. 10 Year ARI Regional                 18. 100 Year ARI Climate
      2.    50 Year ARI Local                                              8. 100 Year ARI Storm Surge               14. 5 Year ARI Regional                      Change
      3.    20 Year ARI Local                                              9. 100 Year ARI Storm Surge               15. 2 Year ARI Regional
      4.    10 Year ARI Local                                              10. 100 Year ARI Regional                 16. PMF
      5.    5 Year ARI Local                                               11. 50 Year ARI Regional                  17. 100 Year ARI Climate
      6.    2 Year ARI Local                                               12. 20 Year ARI Regional                      Change



              Table G 2             Developed Case Peak Flows
                                                                                                           Developed Case Peak Flows (m3/s)
                                                                                                                     Design Event
 Comparison                                                                                                                                                                           17
                         Location                                                                                    8 and
 Point                                                  1              2       3       4      5      6         7               10      11       12     13     14      15      16     and
                                                                                                                       9
                                                                                                                                                                                      18
                         upstream of
 Q1                                                  23.2         19.1        16.3   12.4    9.5     5.2      2.9     23.2    13.4    11.2      9.2    7.3    5.8    3.5     87.1    28.7
                         Lot 11
 Q2                      Lot 11                      20.2         16.1        12.9    9.1    6.3     3.0      2.0     22.8    14.8    12.3      9.9    7.7    5.8    2.7     83.9    30.3
                         downstream
 Q3                                                  24.0         19.2        15.1   10.8    7.5     3.1      1.7     27.1    18.8    15.9      12.5   9.2    6.8    3.0    102.1    38.3
                         Lot11
                         upstream of
 Q4                                                  15.6         12.1        9.6     6.9    5.8     4.1      2.8     15.6    6.7     5.9       5.1    4.2    3.7    2.5     66.6    19.8
                         easement
                         downstream of
 Q5                                                  13.6         10.4        8.3     6.6    5.3     4.0      2.8     13.8    7.2     6.2       5.4    4.2    3.5    2.5     55.4    18.1
                         easement
 Q6                      Precinct L                  49.4         41.1        36.0   28.3    22.7   13.7      8.9     49.5    27.2    23.1      19.3   15.5   12.4   8.0    207.9    60.1
                         upstream of
 LEB3 us                 LEB Crossing                63.7         52.8        45.9   35.6    28.1   17.4      10.6    63.9    35.9    30.3      25.2   20.1   16.2   10.1   281.1    78.3
                         3
                         upstream of
 AspPl us                                            56.0         48.6        42.7   32.8    25.1   15.6      9.1     56.1    33.9    28.2      23.2   18.2   14.3   8.2    187.4    62.4
                         Aspera Pl
                         downstream of
 AspPl ds                                            52.6         45.6        40.2   32.7    24.6   13.1      7.0     52.7    33.2    28.6      23.3   18.2   14.3   8.2    179.3    59.3
                         Aspera Pl
                         upstream of
 LEB2 us                 LEB Crossing                64.6         54.3        48.1   38.2    30.5   18.8      12.0    64.6    34.8    29.7      24.9   20.1   16.4   10.6   238.0    77.0
                         2
                         LEB - adjacent
 LEB2 ds                                             67.2         54.6        48.0   38.1    30.6   19.4      12.7    67.4    36.1    31.0      26.2   21.4   17.8   12.1   320.8    87.6
                         to flooded lots
 EC1                     Eenie Ck                    42.9         35.3        30.8   25.2    20.6   13.1      8.4     42.9    22.7    19.4      16.5   13.4   11.0   7.2    169.0    52.3


Northbrook Corporation Pty Ltd                                                                                                                                               13 September 2013
O:\5101-19-03\wp\R1v4 Flood Study\Appendices\App G - Peak Flows.docx                                                                                                                   Page 3


[OCR of page images]
Sa) Cardno

 

Design Events

1. 100 Year ARI Local 7. 1 Year ARI Local 13. 10 Year ARI Regional 18. 100 Year ARI Climate
2. 50 Year ARI Local 8. 100 Year ARI Storm Surge 14. 5 Year ARI Regional Change

3. 20 Year ARI Local 9. 100 Year ARI Storm Surge 15. 2 Year ARI Regional

4. 10 Year ARI Local 10. 100 Year ARI Regional 16. PMF

5. 5 Year ARI Local 11. 50 Year ARI Regional 17. 100 Year ARI Climate

6. 2 Year ARI Local 12. 20 Year ARI Regional Change

Table G2 Developed Case Peak Flows

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Developed Case Peak Flows (m*/s)
Design Event
Comparison | | ti 8 and 17
Point Ocation 1 2 3 4 5 6 7 9 10 11 12 13 14 15 16 and
18
Qi ipa of 23.2 | 191 | 163 | 124) 95 | 52 | 29 | 232) 134] 11.2] 92 | 73 | 58 | 3.5 | 874 | 287
Q2 Lot 11 20.2 | 161 | 129] 91 | 63 | 30 | 20 | 228 | 148] 123 | 99 | 77 | 58 | 27 | 839 | 303
Q3 rownstream 24.0 | 19.2 | 151 | 108 | 75 | 3.1 17 | 271 | 188 | 159 | 125] 92 | 68 | 3.0 | 1021] 38.3
upstream of
Q4 casement 156 | 121 | 96 | 69 | 58 | 41 | 28 | 156] 67 | 59 | 51 | 42 | 37 | 25 | 666 | 19.8
downstream of
Q5 casement 136 | 104 | 83 | 66 | 53 | 40 | 28 | 138] 72 | 62 | 54 | 42 | 35 | 25 | 55.4 | 1814
Q6 Precinct L 49.4 | 41.1 | 36.0 | 283 | 227 | 137 | 89 | 495 | 272 | 231 | 193 | 155 | 124 | 80 | 207.9| 60.1
upstream of
LEB3 us LEB Crossing | 63.7 | 52.8 | 45.9 | 35.6 | 28.1 | 17.4 | 106 | 639 | 35.9 | 30.3 | 252 | 201 | 162 | 10.1 | 281.1 | 783
3
AspPI us peor Pl 56.0 | 48.6 | 427 | 328 | 25.1 | 156 | 91 | 561 | 339 | 282 | 23.2 | 182 | 143 ] 82 | 187.4] 62.4
AspPI ds Aepora Pl of | 526 | 456 | 402 | 327 | 246 | 131 | 70 | 527 | 332 | 286 | 233 | 182 143 | 82 | 1793/ 593
upstream of
LEB2 us LEB Crossing | 64.6 | 54.3 | 48.1 | 382 | 30.5 | 188 | 120 | 646 | 348 | 29.7 | 249 | 201 | 164 | 10.6 | 238.0 | 77.0
2
LEB - adjacent
LEB2 ds fofloodedlots | 672 | 546 | 48.0 | 38.1 | 30.6 | 194 | 127 | 67.4 | 36.1 | 31.0 | 26.2 | 21.4 | 178 | 121 | 320.8 | 87.6
EC1 Eenie Ck 42.9 | 35.3 | 308 | 252 | 206 | 131 | 84 | 429 | 227 ] 194 | 165 | 13.4 | 11.0 ] 7.2 | 169.0| 523
Northbrook Corporation Pty Ltd 13 September 2013

45101-19-03\wp\R1v4 Flood Study\Appendices\App G - Peak Flows.docx Page 3

Used in these records

About this file

File size
37.1 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Attachment 13- Amended Flood Study MCU12_0208.pdf · 37.1 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.