Skip to the record
The definitive source for everything Noosa Council.

Council archive · source document

Attachment 13- Amended Flood Study MCU12/0208

of 130

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (37.1 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.

Original PDF page 107, section 1. The text section number identifies this passage in the reader.

                                                                                                        Developed Case Peak Flows (m3/s)
                                                                                                                  Design Event
 Comparison                                                                                                                                                                      17
                         Location                                                                                 8 and
 Point                                                  1              2    3       4      5      6         7              10      11      12     13     14     15      16      and
                                                                                                                    9
                                                                                                                                                                                 18
 EC2                     Eenie Ck                   106.1         86.5     75.3    59.4   47.6   30.9      20.0   106.7   59.8    50.9     42.6   34.5   28.2   19.2   480.4   137.2
 EC3                     Eenie Ck                   166.0        136.5     116.2   90.5   70.2   41.4      25.4   169.4   105.1   89.5     73.2   58.2   46.7   29.6   722.1   214.9
                         Eenie Ck and
 EC4                                                174.8        142.0     117.9   89.7   69.1   40.9      25.5   191.2   124.2   104.9    84.6   66.2   52.1   31.7   819.6   254.3
                         Keyser Ck




Northbrook Corporation Pty Ltd                                                                                                                                          13 September 2013
O:\5101-19-03\wp\R1v4 Flood Study\Appendices\App G - Peak Flows.docx                                                                                                              Page 4


[OCR of page images]
 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Developed Case Peak Flows (m*/s)
Design Event

Comparison | | ocati 8 and 17
Point ocation 1 2 3 4 5 6 7 9 10 11 12 13 14 15 16 and

18
EC2 Eenie Ck 106.1] 86.5 | 75.3 | 59.4 | 476 | 309 | 200 | 1067] 598 | 509 | 426 | 345 | 28.2 | 19.2 | 480.4 | 137.2
EC3 Eenie Ck 166.0 | 136.5 | 116.2] 90.5 | 70.2 | 41.4 | 25.4 | 169.4 | 105.1 | 895 | 73.2 | 58.2 | 46.7 | 29.6 | 722.1 | 214.9
EC4 Kereor Ok 174.8 | 142.0 | 117.9| 89.7 | 69.1 | 40.9 | 25.5 | 191.2 | 124.2 | 104.9] 84.6 | 66.2 | 52.1 | 31.7 | 819.6 | 254.3

 

 

 

 

Northbrook Corporation Pty Ltd
45101-19-03\wp\R1v4 Flood Study\Appendices\App G - Peak Flows.docx

13 September 2013

Page 4

Used in these records

About this file

File size
37.1 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Attachment 13- Amended Flood Study MCU12_0208.pdf · 37.1 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.