Skip to the record
Accept no substitutions.

Council archive · source document

Attachment 13- Amended Flood Study MCU12/0208

of 130

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (37.1 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.

Original PDF page 11, section 1. The text section number identifies this passage in the reader.

Noosa on Weyba
Flood Study



Table 3-1              TUFLOW Model Runs

     Model Run                   Local Inflows                 Tailwater Level       Resultant ARI
      Number                                                                              (y)
 Local Events - MHWS
            1                    100 year ARI                      MHWS                  100
            2                     50 year ARI                      MHWS                   50
            3                     20 year ARI                      MHWS                   20
            4                     10 year ARI                      MHWS                   10
            5                     5 year ARI                       MHWS                   5
            6                     2 year ARI                       MHWS                   2
            7                     1 year ARI                       MHWS                   1
 100 Year ARI Local Event – Storm Surge
            8                     20 year ARI               1.8 mAHD – 100 year          100
                                                                 storm surge
            9                    100 year ARI            1.5 mAHD - 20 year storm        100
                                                                 surge
 Regional Events
           10                  100 year, 30 hour             Regional 100 year,          100
                                                                  30 hour
                                                            (peak of 2.04 mAHD)
           11                   50 year, 30 hour              Regional 50 year,           50
                                                                  30 hour
                                                            (peak of 1.76 mAHD)
           12                   20 year, 30 hour              Regional 20 year,           20
                                                                  30 hour
                                                            (peak of 1.52 mAHD)
           13                   10 year, 30 hour              Regional 10 year,           10
                                                                  30 hour
                                                            (peak of 1.39 mAHD)
           14                   5 year, 30 hour               Regional 5 year,            5
                                                                  30 hour
                                                            (peak of 1.33 mAHD)
           15                   2 year, 30 hour               Regional 2 year,            2
                                                                  30 hour
                                                            (peak of 1.26 mAHD)
 Probable Maximum Flood
           16                        PMF                   2.68 mAHD - 1000 year         PMF
                                                                Storm Surge
 Climate Change
           17                    20 year ARI –              2.6 mAHD – 100 year        100 (CC)
                               increased by 20%              storm surge + 0.8m

           18               100 year ARI - increased      2.3 mAHD - 20 year storm     100 (CC)
                                    by 20%                      surge + 0.8m


The initial water levels in TUFLOW were set to equal the downstream tailwater condition. The existing dam
located within the Hofmann site was assumed to be full prior to the start of the storm events.



Northbrook Corporation Pty Ltd                               Version 4                               16 September 2013
Flood Study v4 2.doc                                   Commercial in Confidence                                Page 6

Used in these records

About this file

File size
37.1 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Attachment 13- Amended Flood Study MCU12_0208.pdf · 37.1 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.