Council archive · source document
Attachment 13- Amended Flood Study MCU12/0208
Very large file (37.1 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.
Original PDF page 10, section 1. The text section number identifies this passage in the reader.
Noosa on Weyba Flood Study The 100 year ARI local flood event was also run in combination with storm surge as a tailwater condition, to check the 100 year ARI levels throughout the site. The 100 year ARI local flows were combined with the 20 year ARI storm surge level of 1.5 mAHD. The 20 year ARI local flows and the 100 year ARI storm surge level of 1.8 mAHD were also run. The Noosa River Flood Study (JWP, 1995) estimates that both of these combinations are equivalent to a 100 year ARI event. The 100 year ARI inflows with the 20 year ARI storm surge resulted in the highest peak water levels throughout the site. For the regional flood events the initial water level and tailwater level were set as the hydrograph from the Mike 11 model at Weyba 6.5 for the 30 hour event. The hydrographs were scaled to match the reported peak levels from the upgraded modelling. The peak tailwater levels adopted were: 100 year ARI = 2.04 mAHD (20 year ARI storm tide tailwater); 50 year ARI = 1.76 mAHD (10 year ARI storm tide tailwater); 20 year ARI = 1.52 mAHD (5 year ARI storm tide tailwater); 10 year ARI = 1.39 m AHD (HAT tailwater); 5 year ARI = 1.33 m AHD (HAT tailwater); and 2 year ARI = 1.26 m AHD (HAT tailwater). For the climate change scenario a sea level rise of 0.8m was adopted, as recommended by the Queensland Coastal Plan (2012) for the year 2100. The tailwater level for the 100 year ARI local event was therefore set at 2.3 mAHD, which is the current 20 year ARI storm surge level plus 0.8 metres. An equivalent 100 year ARI event (as indicated in the Noosa River Flood Study) is considered to be the 20 year ARI local flows with a 100 year ARI storm surge level. This scenario, which had a tailwater level of 2.6 mAHD, was therefore also modelled. The impact of sea level rise on the regional flood event, which would then be adopted as the tailwater condition, was not available. However, given that the local flood levels throughout the site are typically higher than the regional flood levels, it was not considered necessary to model this event. For the Probable Maximum Flood (PMF) event, a tailwater condition of 2.68 mAHD was adopted. This is the 1000 year ARI storm surge level as defined by the Queensland Climate Change and Community Vulnerability to Tropical Cyclones (2004) report. This is the tailwater condition currently being used by Council to define the PMF event. It should be noted that the Noosa River Flood Study used the 100 year ARI storm surge level in combination PMF river inflows as the PMF event. Therefore the current PMF scenario is a conservative assumption. 3.2.6 Model Runs The model runs conducted for the analysis are listed in Table 3.1 below. The local flood events were run for a range of storm durations. The peak events were the 1.5 and 24 hour events, with the shorter duration event resulting in peaks only in upstream parts of the model. However, for the 24 hour event the peak generally occurred between 2.5 and 4 hours, which was similar to the calculated times of concentration for the catchments (refer Section 4.1). The regional flood event has a time of concentration around 30 hours (per comm. Geoff Newell, SCRC). Therefore for the 100 year ARI regional storm event, the coincident local event (which has a time of concentration of around 3 hours) is approximately equal to the 1 year ARI local storm event. It was therefore decided to use the 30 hour local storm and run it concurrently with the 30 hour regional storm as it resulted in higher regional flood levels. Northbrook Corporation Pty Ltd Version 4 16 September 2013 Flood Study v4 2.doc Commercial in Confidence Page 5
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment 13- Amended Flood Study MCU12/0208Related documentApplication case desk ↗
About this file
- File size
- 37.1 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.