Attachment 13- Amended Flood Study MCU12/0208

of 130

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (37.1 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.

Original PDF page 10, section 1. The text section number identifies this passage in the reader.

Noosa on Weyba
Flood Study



The 100 year ARI local flood event was also run in combination with storm surge as a tailwater condition, to
check the 100 year ARI levels throughout the site. The 100 year ARI local flows were combined with the 20
year ARI storm surge level of 1.5 mAHD. The 20 year ARI local flows and the 100 year ARI storm surge
level of 1.8 mAHD were also run. The Noosa River Flood Study (JWP, 1995) estimates that both of these
combinations are equivalent to a 100 year ARI event. The 100 year ARI inflows with the 20 year ARI storm
surge resulted in the highest peak water levels throughout the site.
For the regional flood events the initial water level and tailwater level were set as the hydrograph from the
Mike 11 model at Weyba 6.5 for the 30 hour event. The hydrographs were scaled to match the reported
peak levels from the upgraded modelling. The peak tailwater levels adopted were:
      100 year ARI = 2.04 mAHD (20 year ARI storm tide tailwater);
      50 year ARI = 1.76 mAHD (10 year ARI storm tide tailwater);
      20 year ARI = 1.52 mAHD (5 year ARI storm tide tailwater);
      10 year ARI = 1.39 m AHD (HAT tailwater);
      5 year ARI = 1.33 m AHD (HAT tailwater); and
      2 year ARI = 1.26 m AHD (HAT tailwater).
For the climate change scenario a sea level rise of 0.8m was adopted, as recommended by the Queensland
Coastal Plan (2012) for the year 2100. The tailwater level for the 100 year ARI local event was therefore set
at 2.3 mAHD, which is the current 20 year ARI storm surge level plus 0.8 metres. An equivalent 100 year
ARI event (as indicated in the Noosa River Flood Study) is considered to be the 20 year ARI local flows with
a 100 year ARI storm surge level. This scenario, which had a tailwater level of 2.6 mAHD, was therefore
also modelled. The impact of sea level rise on the regional flood event, which would then be adopted as the
tailwater condition, was not available. However, given that the local flood levels throughout the site are
typically higher than the regional flood levels, it was not considered necessary to model this event.
For the Probable Maximum Flood (PMF) event, a tailwater condition of 2.68 mAHD was adopted. This is the
1000 year ARI storm surge level as defined by the Queensland Climate Change and Community
Vulnerability to Tropical Cyclones (2004) report. This is the tailwater condition currently being used by
Council to define the PMF event. It should be noted that the Noosa River Flood Study used the 100 year
ARI storm surge level in combination PMF river inflows as the PMF event. Therefore the current PMF
scenario is a conservative assumption.

3.2.6                  Model Runs
The model runs conducted for the analysis are listed in Table 3.1 below. The local flood events were run for
a range of storm durations. The peak events were the 1.5 and 24 hour events, with the shorter duration
event resulting in peaks only in upstream parts of the model. However, for the 24 hour event the peak
generally occurred between 2.5 and 4 hours, which was similar to the calculated times of concentration for
the catchments (refer Section 4.1).
The regional flood event has a time of concentration around 30 hours (per comm. Geoff Newell, SCRC).
Therefore for the 100 year ARI regional storm event, the coincident local event (which has a time of
concentration of around 3 hours) is approximately equal to the 1 year ARI local storm event. It was therefore
decided to use the 30 hour local storm and run it concurrently with the 30 hour regional storm as it resulted in
higher regional flood levels.




Northbrook Corporation Pty Ltd                     Version 4                                   16 September 2013
Flood Study v4 2.doc                         Commercial in Confidence                                    Page 5

Used in these records

About this file

File size
37.1 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Attachment 13- Amended Flood Study MCU12_0208.pdf · 37.1 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.