Design Events
1. 100 Year ARI Local 6. 2 Year ARI Local 11. 50 Year ARI Regional 16. PMF
2. 50 Year ARI Local 7. 1 Year ARI Local 12. 20 Year ARI Regional 17. 100 Year ARI Climate
3. 20 Year ARI Local 8. 100 Year ARI Storm Surge 13. 10 Year ARI Regional Change
4. 10 Year ARI Local 9. 100 Year ARI Storm Surge 14. 5 Year ARI Regional 18. 100 Year ARI Climate
5. 5 Year ARI Local 10. 100 Year ARI Regional 15. 2 Year ARI Regional Change
Table H 1 Existing Case Peak Velocities
Existing Case Peak Velocities (m/s)
Design Event
Comparison 8 17
Location 1 2 3 4 5 6 7 and 10 11 12 13 14 15 16 and
Point
9 18
TidsRd Tidswell Road 0.64 0.63 0.59 0.63 0.67 0.70 0.68 0.64 0.67 0.69 0.63 0.65 0.68 0.70 0.84 0.74
downstream of
ds_TidsRd 0.27 0.60 0.23 0.20 0.18 0.35 0.25 0.27 0.15 0.14 0.13 0.12 0.11 0.09 0.46 0.24
Tidswell Road
H0 0.33 0.30 0.28 0.24 0.21 0.15 0.10 0.33 0.24 0.22 0.19 0.17 0.14 0.11 0.65 0.37
H1 0.37 0.35 0.32 0.28 0.22 0.12 0.02 0.37 0.28 0.25 0.21 0.17 0.13 0.04 0.40 0.40
upstream of
H2 0.71 0.73 0.73 0.75 0.71 0.75 0.74 0.73 0.55 0.73 0.71 0.75 0.71 0.71 0.53 0.54
Lot 11
H3 Lot 11 south 0.22 0.21 0.19 0.20 0.35 0.38 0.26 0.22 0.12 0.12 0.12 0.10 0.09 0.08 0.21 0.13
H4 Lot 11 centre 0.18 0.17 0.15 0.14 0.12 0.09 0.06 0.18 0.10 0.12 0.12 0.11 0.10 0.07 0.16 0.10
H5 Lot 11 north 0.29 0.18 0.21 0.26 0.21 0.20 0.13 0.29 0.09 0.11 0.12 0.11 0.10 0.08 0.18 0.10
H6 Keyser Ck 0.33 0.31 0.37 0.29 0.29 0.28 0.31 0.33 0.10 0.12 0.14 0.16 0.15 0.14 0.23 0.13
H7 Keyser Ck 0.16 0.14 0.13 0.11 0.09 0.06 0.04 0.16 0.07 0.07 0.07 0.06 0.06 0.04 0.24 0.10
upstream of
H8 new road – 0.47 0.44 0.41 0.37 0.35 0.29 0.25 0.47 0.31 0.29 0.27 0.25 0.24 0.22 0.78 0.48
Nature Refuge
tributary
NBK03_road 0.60 0.58 0.55 0.53 0.52 0.49 0.42 0.60 0.47 0.45 0.43 0.42 0.39 0.31 0.84 0.60
crossing
upstream
H9 0.66 0.65 0.66 0.66 0.68 0.63 0.49 0.66 0.65 0.60 0.54 0.49 0.37 0.09 0.61 0.66
Hollett Road
HollRd Hollett Rd 0.23 0.22 0.23 0.22 0.21 0.21 0.18 0.23 0.27 0.22 0.21 0.19 0.15 0.13 0.44 0.23
H10 Lot 53 0.42 0.40 0.38 0.36 0.34 0.31 0.31 0.42 0.33 0.31 0.30 0.29 0.29 0.26 0.60 0.44
H11 upstream of 0.58 0.56 0.54 0.49 0.45 0.38 0.41 0.58 0.43 0.41 0.38 0.35 0.31 0.25 0.80 0.58
Northbrook Corporation Pty Ltd 13 September 2013
O:\5101-19-03\wp\R1v4 Flood Study\Appendices\App H - Peak Velocities.docx Page 1
[OCR of page images]
cy Cardno
Design Events
1. 100 Year ARI Local 6. 2 Year ARI Local 11. 50 Year ARI Regional 16. PMF
2. 50 Year ARI Local 7. 1 Year ARI Local 12. 20 Year ARI Regional 17. 100 Year ARI Climate
3. 20 Year ARI Local 8. 100 Year ARI Storm Surge 13. 10 Year ARI Regional Change
4. 10 Year ARI Local 9. 100 Year ARI Storm Surge 14. 5 Year ARI Regional 18. 100 Year ARI Climate
5. 5 Year ARI Local 10. 100 Year ARI Regional 15. 2 Year ARI Regional Change
TableH1 Existing Case Peak Velocities
Existing Case Peak Velocities (m/s)
Design Event
Comparison . 8 17
Point Location 1 2 3 4 5 6 7 and | 10 11 12 13 14 15 16 | and
9 18
TidsRd Tidswell Road 0.64 | 0.63 | 0.59 | 0.63 | 0.67 | 0.70 | 0.68 | 0.64 | 0.67 | 0.69 | 0.63 | 0.65 | 0.68 | 0.70 | 0.84 | 0.74
. downstream of
ds_TidsRd Tidswell Road 0.27 | 0.60 | 0.23 | 0.20 | 0.18 | 0.35 | 0.25 | 0.27 | 0.15 | 0.14 | 0.13 | 0.12 | 0.11 | 0.09 | 0.46 | 0.24
HO 0.33 | 0.30 | 0.28 | 0.24 | 0.21 | 0.15 | 0.10 | 0.33 | 0.24 | 0.22 | 0.19 | 0.17 | 0.14 | 0.11 | 0.65 | 0.37
H1 0.37 | 0.35 | 0.32 | 0.28 | 0.22 | 0.12 | 0.02 | 0.37 | 0.28 | 0.25 | 0.21 | 0.17 | 0.13 | 0.04 | 0.40 | 0.40
H2 re o" of 0.71 | 0.73 | 0.73 | 0.75 | 0.71 | 0.75 | 0.74 | 0.73 | 0.55 | 0.73 | 0.71 | 0.75 | 0.71 | 0.71 | 0.53 | 0.54
H3 Lot 11 south 0.22 | 0.21 | 0.19 | 0.20 | 0.35 | 0.38 | 0.26 | 0.22 | 0.12 | 0.12 | 0.12 | 0.10 | 0.09 | 0.08 | 0.21 | 0.13
H4 Lot 11 centre 0.18 | 0.17 | 0.15 | 0.14 | 0.12 | 0.09 | 0.06 | 0.18 | 0.10 | 0.12 | 0.12 | 0.11 | 0.10 | 0.07 | 0.16 | 0.10
H5 Lot 11 north 0.29 | 0.18 | 0.21 | 0.26 | 0.21 | 0.20 | 0.13 | 0.29 | 0.09 | 0.11 | 0.12 | 0.11 | 0.10 | 0.08 | 0.18 | 0.10
H6 Keyser Ck 0.33 | 0.31 | 0.37 | 0.29 | 0.29 | 0.28 | 0.31 | 0.33 | 0.10 | 0.12 | 0.14 | 0.16 | 0.15 | 0.14 | 0.23 | 0.13
H7 Keyser Ck 0.16 | 0.14 | 0.13 | 0.11 | 0.09 | 0.06 | 0.04 | 0.16 | 0.07 | 0.07 | 0.07 | 0.06 | 0.06 | 0.04 | 0.24 | 0.10
upstream of
H8 new road — 0.47 | 0.44 | 0.41 | 0.37 | 0.35 | 0.29 | 0.25 | 0.47 | 0.31 | 0.29 | 0.27 | 0.25 | 0.24 | 0.22 | 0.78 | 0.48
Nature Refuge
NBKO3_road srossiny 0.60 | 0.58 | 0.55 | 0.53 | 0.52 | 0.49 | 0.42 | 0.60 | 0.47 | 0.45 | 0.43 | 0.42 | 0.39 | 0.31 | 0.84 | 0.60
upstream
H9 Hollett Road 0.66 | 0.65 | 0.66 | 0.66 | 0.68 | 0.63 | 0.49 | 0.66 | 0.65 | 0.60 | 0.54 | 0.49 | 0.37 | 0.09 | 0.61 | 0.66
HollRd Hollett Rd 0.23 | 0.22 | 0.23 | 0.22 | 0.21 | 0.21 | 0.18 | 0.23 | 0.27 | 0.22 | 0.21 | 0.19 | 0.15 | 0.13 | 0.44 | 0.23
H10 Lot 53 0.42 | 0.40 | 0.38 | 0.36 | 0.34 | 0.31 | 0.31 | 0.42 | 0.33 | 0.31 | 0.30 | 0.29 | 0.29 | 0.26 | 0.60 | 0.44
H11 upstream of 0.58 | 0.56 | 0.54 | 0.49 | 0.45 | 0.38 | 0.41 | 0.58 | 0.43 | 0.41 | 0.38 | 0.35 | 0.31 | 0.25 | 0.80 | 0.58
Northbrook Corporation Pty Ltd 13 September 2013
45101-19-03\wp\R1v4 Flood Study\Appendices\App H - Peak Velocities.docx Page 1
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment 13- Amended Flood Study MCU12/0208Related documentApplication case desk ↗
About this file
- File size
- 37.1 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.