Skip to the record
Accept no imitations.

Council archive · source document

Attachment 13- Amended Flood Study MCU12/0208

of 130

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (37.1 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.

Original PDF page 112, section 1. The text section number identifies this passage in the reader.

                                                                                                      Existing Case Peak Velocities (m/s)
                                                                                                                 Design Event
 Comparison                                                                                                        8                                                       17
                          Location                       1           2       3      4      5      6        7      and    10      11     12    13     14     15     16     and
 Point
                                                                                                                   9                                                       18
                          easement
 ease_road                easement                    0.81        0.81      0.83   0.83   0.87   0.80     0.84   0.81    0.77   0.84   0.83   0.80   0.85   0.81   0.70   0.61
                          downstream of
 H12                                                  0.80        0.75      0.73   0.68   0.64   0.66     0.44   0.80    0.55   0.57   0.57   0.54   0.47   0.43   0.97   0.67
                          easement
                          confluence
 H13                                                  0.24        0.22      0.19   0.18   0.16   0.12     0.09   0.24    0.07   0.07   0.08   0.08   0.08   0.07   0.16   0.12
                          Eenie Ck
                          upstream
 H14                                                  0.61        0.58      0.55   0.53   0.49   0.43     0.37   0.61    0.49   0.47   0.43   0.36   0.33   0.28   0.98   0.57
                          Precinct L
 H15                      Precinct L                  0.63        0.60      0.57   0.53   0.50   0.44     0.38   0.63    0.50   0.48   0.41   0.39   0.36   0.30   0.89   0.59
                          upstream of
 LEB3 us                  LEB Crossing                0.42        0.47      0.53   0.46   0.56   0.59     0.54   0.42    0.17   0.27   0.27   0.27   0.28   0.39   1.02   0.35
                          3
                          LEB Crossing
 LEB3                                                 0.56        0.29      0.17   0.00   0.00   0.00     0.00   0.57    0.00   0.00   0.00   0.00   0.00   0.00   1.21   1.01
                          3
                          upstream of
 AspPl us                                             3.06        2.44      2.61   2.51   2.46   2.31     2.15   3.06    1.90   1.82   1.73   1.59   1.70   1.43   1.79   1.14
                          Aspera Pl
 AspPl                    Aspera Pl                   0.00        0.00      0.00   0.00   0.00   0.00     0.00   0.00    0.00   0.00   0.00   0.00   0.00   0.00   3.27   0.67
                          downstream of
 AspPl ds                                             0.75        0.69      0.63   0.56   0.46   0.43     0.33   0.75    0.56   0.51   0.44   0.37   0.32   0.24   1.24   0.76
                          Aspera Pl
                          upstream of
 LEB2 us                  LEB Crossing                1.52        0.55      1.59   1.47   0.34   0.32     0.73   1.52    0.38   0.33   0.38   0.22   0.19   1.00   1.12   0.68
                          2
                          LEB Crossing
 LEB2                                                 1.43        1.34      1.26   1.07   0.83   0.30     0.00   1.43    0.98   0.81   0.62   0.35   0.08   0.00   1.97   1.46
                          2
                          LEB - adjacent
 LEB2 ds                                              1.10        1.10      1.07   1.06   1.11   1.05     1.03   1.10    0.87   0.96   0.98   0.95   0.95   0.95   1.31   0.91
                          to flooded lots
                          upstream of
 LEB1 us                  LEB Crossing                1.73        1.38      0.74   1.26   0.78   0.70     1.26   1.73    0.60   0.59   0.61   0.84   0.54   0.50   1.06   0.61
                          1 (Eenie Ck)
                          LEB Crossing
 LEB1                                                 1.05        0.93      0.12   0.00   0.00   0.00     0.00   1.09    0.00   0.00   0.00   0.00   0.00   0.00   2.12   1.41
                          1
 EC1                      Eenie Ck                    0.21        0.19      0.17   0.15   0.41   0.19     0.23   0.21    0.13   0.12   0.14   0.09   0.07   0.21   0.50   0.24
 EC2                      Eenie Ck                    1.23        1.19      1.13   1.07   1.03   0.85     0.69   1.23    0.79   0.83   0.83   0.79   0.73   0.63   1.48   0.97


Northbrook Corporation Pty Ltd                                                                                                                                            13 September 2013
O:\5101-19-03\wp\R1v4 Flood Study\Appendices\App H - Peak Velocities.docx                                                                                                           Page 2


[OCR of page images]
 

 

Existing Case Peak Velocities (m/s)

 

Design Event

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Comparison . 8 17
Point Location 1 2 3 4 5 6 7 and | 10 11 12 13 14 15 16 | and
9 18

easement

ease_road | easement 0.81 | 0.81 | 0.83 | 0.83 | 0.87 | 0.80 | 0.84 | 0.81 | 0.77 | 0.84 | 0.83 | 0.80 | 0.85 | 0.81 | 0.70 | 0.61

H12 cownstream of | ogo | 075 | 0.73 | 068 | 0.64 | 0.66 | 0.44 | 080 | 055 | 057 | 057 | 054 | 0.47 | 0.43 | 0.97 | 0.67

H13 pone 0.24 | 0.22 | 0.19 | 0.18 | 0.16 | 0.12 | 0.09 | 0.24 | 0.07 | 0.07 | 0.08 | 0.08 | 0.08 | 0.07 | 0.16 | 0.12

H14 aaa 0.61 | 0.58 | 0.55 | 0.53 | 0.49 | 0.43 | 0.37 | 0.61 | 0.49 | 0.47 | 0.43 | 0.36 | 0.33 | 0.28 | 0.98 | 0.57

H15 Precinct L 0.63 | 0.60 | 0.57 | 0.53 | 0.50 | 0.44 | 0.38 | 0.63 | 0.50 | 0.48 | 0.41 | 0.39 | 0.36 | 0.30 | 0.89 | 0.59
upstream of

LEB3 us LEB Crossing | 0.42 | 0.47 | 0.53 | 0.46 | 0.56 | 0.59 | 0.54 | 0.42 | 0.17 | 0.27 | 0.27 | 0.27 | 0.28 | 0.39 | 1.02 | 0.35
3

LEB3 3 Crossing | 956 | 0.29 | 0.17 | 0.00 | 0.00 | 0.00 | 0.00 | 0.57 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 1.21 | 1.01

AspPI us peor Pl 3.06 | 2.44 | 2.61 | 2.51 | 2.46 | 2.31 | 2.15 | 3.06 | 1.90 | 1.82 | 1.73 | 1.59 | 1.70 | 1.43 | 1.79 | 1.14

AspPI Aspera Pl 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 3.27 | 0.67

AspPI ds Aepora Pl of | 075 | 069 | 063 | 056 | 0.46 | 0.43 | 033 | 0.75 | 056 | 051 | 0.44 | 037 | 0.32 | 0.24 | 1.24 | 0.76
upstream of

LEB2 us LEB Crossing | 1.52 | 0.55 | 1.59 | 1.47 | 0.34 | 0.32 | 0.73 | 1.52 | 0.38 | 0.33 | 0.38 | 0.22 | 0.19 | 1.00 | 1.12 | 0.68
2

LEB2 a Crossing | 443 | 1.34 | 1.26 | 1.07 | 083 | 0.30 | 0.00 | 1.43 | 0.98 | 0.81 | 0.62 | 0.35 | 0.08 | 0.00 | 1.97 | 1.46
LEB - adjacent

LEB2 ds foflooded tots. | 110 | 1.10 | 1.07 | 1.06 | 1.11 | 1.05 | 1.03 | 1.10 | 0.87 | 0.96 | 0.98 | 0.95 | 0.95 | 0.95 | 1.31 | 0.91
upstream of

LEB1 us LEB Crossing | 1.73 | 1.38 | 0.74 | 1.26 | 0.78 | 0.70 | 1.26 | 1.73 | 0.60 | 0.59 | 0.61 | 0.84 | 0.54 | 0.50 | 1.06 | 061
1 (Eenie Ck)

LEB1 ce Crossing | +5 | 0.93 | 0.12 | 0.00 | 0.00 | 0.00 | 0.00 | 1.09 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 2.12 | 1.41

ECI Eenie Ck 0.21 | 0.19 | 0.17 | 0.15 | 0.41 | 0.19 | 0.23 | 0.21 | 0.13 | 0.12 | 0.14 | 0.09 | 0.07 | 0.21 | 0.50 | 0.24

EC2 Eenie Ck 1.23 | 1.19 | 1.13 | 1.07 | 1.03 | 0.85 | 0.69 | 1.23 | 0.79 | 0.83 | 0.83 | 0.79 | 0.73 | 0.63 | 1.48 | 0.97

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Northbrook Corporation Pty Ltd
45101-19-03\wp\R1v4 Flood Study\Appendices\App H - Peak Velocities.docx

13 September 2013

Page 2

Used in these records

About this file

File size
37.1 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Attachment 13- Amended Flood Study MCU12_0208.pdf · 37.1 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.