HYDROLOGY AND FLOODING

The following are the responses to SCRC RFI (DW008:MCU12/0208) received on the 28th of February 2013.

Item 86
Issue
For PMF events trafficability has been assumed if the depth is less than 400mm with a dV product of
0.45m2/s. Insufficient justification has been provided to confirm that this depth and dV product is
acceptable for emergency vehicles to access the site.

Section 7.2.1 of the Flood Study (Cardno, September 2013) addresses this item.
During PMF events, access for emergency vehicles would be required. These vehicles are typically larger
than standard vehicles and so can handle greater flow depths across roads. Based on Project 10 of
Australian Rainfall and Runoff (AR&R): Appropriate Safety Criteria for Vehicles (2011), large 4WDs can
cross roads with maximum depths of 500mm, with a limiting dV product of 0.6 m 2/s. Large passenger cars
can cross roads with maximum depths of 400mm, with a limiting dV product of 0.45 m 2/s. For PMF events
trafficability was therefore conservatively assumed if the depth was less than 400mm with a dV product of
0.45 m2/s.
The Queensland Department of Community Safety was contacted regarding the trafficability criteria used for
emergency vehicles. They advised that scenarios were assessed on a case by case basis and that a
specific guideline was not used. However, it should be noted that the AR&R project references the
Emergency Management Australia (EMA) manual for emergency vehicle 4WD operation that states that “if
water reaches to the bumper bar or higher, upon entering the water accelerate until a bow wave forms in
front of the vehicle. Maintain this bow wave at all costs, to keep water out of the engine.” In water depths of
greater than 750mm, it is suggested that either a snorkel extension to the engine air inlet and exhaust
system is fitted or a canvas sheet or tarp is placed across the grille to prevent water entering the engine
bay.”
For similar developments in Brisbane a maximum depth of 500mm and dV product of 0.6 m 2/s has been
utilised to determine PMF trafficability for emergency vehicles. This is based on the Brisbane City Council
(BCC) Subdivision and Development Guidelines (2008), Chapter 1 Part A which states that with flood depths
less than 500mm and a dV product less than 0.6 m2/s, that evacuation of persons and possessions via
trucks is possible and that fit adults can wade through floodwaters.
Item 87
Issue
A sensitivity analysis has been undertaken to determine the impact of culvert blockage. In
accordance with QUDM; 20% blockage of the proposed culverts has been considered. 20% culvert
blockage is considered suitable in situations where there is a relief overland flowpath which will
function prior to houses being inundated. However, the proposed minimum road level of 4.00m AHD
for the Northern Keyser Creek Crossing means that proposed floor levels on upstream lots will be
inundated prior to any relief overland flowpath beginning to function.

Section 8.4.3 of the Flood Study (Cardno, September April 2013) addresses this item.

Since the original application was prepared, the location of the access road to the site has been relocated to
the southern boundary. It has been offset from this boundary to minimise flood impacts to the neighbouring
properties. This road crossing is now located upstream of Areas F and G, and so blockage of culverts would
have minimal impact to these proposed lots.
The results of the analysis showed that even with complete blockage of all proposed culverts that sufficient
flood immunity is provided for all of the proposed lots. However, the increase upstream of the Keyser Creek
crossing is significant, as the minimum road level (3.83 mAHD) had to be set high enough to maintain
trafficability during a regional PMF event. This could potentially exacerbate existing flooding issues for some
upstream properties.
A range of blockage factors was trialled, to look at the potential impact at comparison points H0, H1, H2 and
H3 which are located upstream of the site in Keyser Creek. The results are shown in the table below.




Northbrook Corporation Pty Ltd                                                                13 September 2013
O:\5101-19-03\wp\R1v4 Flood Study\Appendices\App J - RFI responses.docx                                 Page 1

Used in these records

About this file

File size
37.1 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Attachment 13- Amended Flood Study MCU12_0208.pdf · 37.1 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.