Skip to the record
NoosaWatch™: The source of truth.

Council archive · source document

Attachment 13- Amended Flood Study MCU12/0208

of 130

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (37.1 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.

Original PDF page 20, section 1. The text section number identifies this passage in the reader.

Noosa on Weyba
Flood Study



      Sub-                 100 Year ARI Peak Flow                Sub-           100 Year ARI Peak Flow
                                      3                                                    3
   catchment                        (m /s)                    catchment                  (m /s)
                           Existing         Developed                           Existing           Developed
                            Case              Case                               Case                Case
      EC_E1                  48.7             48.7               KC_I4                4.1             5.7
      EC_E2                   7.6              7.6               KC_I5                3.6             4.9
      EC_E3                   2.5              3.3              LW_62                 47.2           47.2
      EC_E4                   3.0              3.0              LW_63                 33.0           33.0
      EC_F1                   7.8              7.8              LW_64              403.0             403.0
      EC_F2                   1.6              1.9              LW_65              230.0             230.0
      EC_F3                   2.2              3.3              LW_69                 32.9           32.9
      EC_F4                   4.3              4.3              LW_70                 43.6           43.6
      EC_F5                   3.3              4.8               LW_A                 2.5             3.7
      EC_F6                   5.6              5.8               LW_B                 1.6             2.1


For the developed case, for catchments E3, F7 and F8, off-line detention basins will be utilised to reduce
peak flows back to the existing case levels. Therefore for these sub-catchments the existing case inflows
were used in the TUFLOW modelling. The size of the detention basins required will be determined during
detailed design. The proposed culvert crossings will provide “on-line” detention of peak flows for other sub-
catchments. For the catchments draining directly towards Lake Weyba, detention basins are not proposed.
Bio-retention basins and swales will provide attenuation of minor flows. It should be noted that the minor
flow attenuation provided by the proposed rainwater tanks and bio-retention basins has not been included in
the analysis. Appropriate erosion and scour protection will be required on all outlets.

4.3                    PMF Inflows
The WBNM model was used to calculate the Probable Maximum Flood (PMF) flows utilising the Generalised
                                                                       2
Short Duration Method (GSDM) as the catchment area is less than 1000 km . A moisture adjustment factor
(MAF) of 0.85 was adopted and the catchment was assumed to be 100 percent rough. The resultant rainfall
depths for the PMP event are shown in Table 4-7.
Table 4-7              PMF Rainfall

 Duration (min)                       60             90          120         180             270       360
 Rainfall Depth (mm)                  350            448         517         626             747       832


The peak flows from the sub-catchments typically resulted from the 90 minute event and so this was used in
the analysis. It should be noted that in the downstream section of the model, the regional Noosa River PMF
levels event will dominate. The current PMF level in Lake Weyba is 4.23 mAHD.




Northbrook Corporation Pty Ltd                                   Version 4                                     16 September 2013
Flood Study v4 2.doc                                       Commercial in Confidence                                     Page 15

Used in these records

About this file

File size
37.1 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Attachment 13- Amended Flood Study MCU12_0208.pdf · 37.1 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.