Noosa on Weyba
Flood Study
5 TUFLOW Calibration
5.1 February 2012 Event
th
Following the 24 February 2012 flood event debris levels were surveyed by Council around Lake Entrance
Boulevard, located to the north of the site, which had several houses inundated. The survey levels are
shown in Appendix E. The surveyed levels compared to the TUFLOW results are shown in Table 5-1. The
Manning’s n roughness value for densely vegetated areas was increased to a 0.12 (refer Section 3.2) to
provide a closer match to the surveyed flood levels.
Table 5-1 Survey Levels Compared to the TUFLOW Results
Location Survey TUFLOW Difference
Debris Level Result (mm)
Council Survey Levels
Crossing of Lake Entrance Boulevard 4.19 4.19 0
Lots on Lake Entrance Boulevard 3.56 to 3.67 3.58 ~ -40
JFP Survey Levels
Easement 2.8 3.22 420
Eenie Creek 1.3 to 1.4 2.97 ~ 1620
Walter Hay Drive 1.5 2.72 1220
Lot 11 1.2 to 1.5 2.00 to 2.09 ~700
Within the lots along the south-east side of Lake Entrance Boulevard, the debris levels ranged from 3.56 to
3.67 mAHD. In this area the modelled flood level was 3.58 mAHD. On the other side of the road, a debris
level was recorded as 3.75 mAHD. The modelled flood level was 3.57m AHD, as it was downstream of the
other locations. At the creek crossing of Lake Entrance Boulevard the recorded debris level was 4.19
mAHD. The modelled flood level at this location was also 4.19 mAHD. The results of the TUFLOW model
were therefore considered to match very well with the recorded debris levels from Council.
Debris levels surrounding the site were also surveyed by JFP. The survey plan is attached in Appendix E.
th nd
The survey was taken on the 24 of April 2012, and the last significant rainfall event occurred on the 22 of
March 2012. The recorded debris level over the electrical easement was 2.80 mAHD. The modelled flood
level at this location for the February 2012 event was 3.22 mAHD. At the confluence of the local tributary
with Eenie Creek, the recorded debris levels were 1.3 and 1.4 mAHD. The modelled flood level was 2.97
mAHD. At Walter Hay Drive the recorded debris level was 1.5 mAHD and the modelled flood level was 2.72
mAHD. Within Lot 11 on RP893393 the recorded debris levels ranged from 1.2 to 1.5 mAHD. The modelled
flood levels were between 2.00 and 2.09 mAHD.
Compared to the JFP surveyed levels the results of the flood model are significantly higher. There are
several factors that could have influenced this discrepancy;
The survey was conducted two months after the flood event, during which subsequent rainfall events
may have washed away debris;
The rainfall within the local catchments may have been less intense than recorded at the nearby
gauges, which showed an extremely spatially varied rainfall pattern;
The assumed tailwater and initial water level condition of MHWS may have been overly conservative
and impacted on the flood levels of downstream areas;
The existing dam may not have been full prior to the rainfall event and could have provided additional
attenuation of peak flows; and
The ALS data does not penetrate the water surface which can result in an overestimation of minor flood
levels in TUFLOW.
Northbrook Corporation Pty Ltd Version 4 16 September 2013
Flood Study v4 2.doc Commercial in Confidence Page 16
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment 13- Amended Flood Study MCU12/0208Related documentApplication case desk ↗
About this file
- File size
- 37.1 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.