Noosa on Weyba Flood Study 3 Hydraulic Modelling 3.1 Available Flood Modelling Regional flood modelling has been conducted of the Noosa River in Mike 11. The results of this study are outlined in the Noosa River Flood Study (JWP, 1995). This modelling was recently updated by Council to use Version 2010 of Mike 11 and was run for several more storm durations. The cross-sections used in this modelling are shown in Appendix A. This modelling does not include the local tributaries, including Eenie Creek and Keyser Creek, and is therefore not of sufficient quality to use to determine flood levels throughout the site. This regional flood modelling does however take into account the impact of storm surge. The flood search certificate for the site is provided in Appendix B. These flood levels are taken from the updated regional flood modelling. The levels are: 100 year ARI = 2.09 mAHD 20 year ARI = 1.53 mAHD 10 year ARI = 1.45 mAHD A storm tide study of the Noosa River has recently been conducted. However, at the time of writing, the final results of this analysis were not available from Sunshine Coast Regional Council (SCRC). The storm tide levels used as tailwater conditions in the Noosa River Flood Study (JWP, 1995) were: 100 year ARI = 1.8 mAHD 20 year ARI = 1.5 mAHD The peak 100 year regional flood level was a combination of 100 year Average Recurrence Interval (ARI) inflows and the 20 year ARI storm surge (per comm. Geoff Newell, SCRC). The 30 hour storm was the peak regional flood event for Lake Weyba. 3.2 TUFLOW Model 3.2.1 Summary The flow patterns and interactions between the different creeks and Lake Weyba are quite complex and so the software used for this analysis was TUFLOW, which is a two and one dimensional flood model. The model extent included Eenie Creek and its tributaries, Keyser Creek, Lake Weyba and Weyba Creek. Lake Weyba and Weyba Creek were modelled in 1D using the Mike 11 cross-sections from the regional flood model, and trimmed where necessary to avoid duplication of storage. The model extended downstream to Section Weyba 6.5, which is located at Weyba Road. The remaining area used Aerial Laser Survey (ALS) obtained from the Department of Environment and Heritage Protection (DEHP), formerly DERM. The TUFLOW model was validated against the February 2012 flood event which resulted in significant inundation of properties along Lake Entrance Boulevard. TUFLOW Version 2011-09-AF iSP was used in the analysis. 3.2.2 Topography and Grid Size The digital terrain model (DTM) created in 12d used ALS data obtained from DEHP. This data was part of a larger dataset obtained for the SCRC in 2008/09 by Schlencker Mapping Pty Ltd using LiDAR technology. The reported accuracy of this data is: Vertical data: Spatial Accuracy: 0.15m @ 67 % CI Horizontal data: Spatial Accuracy: 0.2 @ 67 % CI Northbrook Corporation Pty Ltd Version 4 16 September 2013 Flood Study v4 2.doc Commercial in Confidence Page 3
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment 13- Amended Flood Study MCU12/0208Related documentApplication case desk ↗
About this file
- File size
- 37.1 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.