Original source · versioned page text
Swmp
5. ESTABLISHMENT AND OPERATIONAL PHASE
MANAGEMENT
Establishment
Experience shows that the critical periods in the life of WSUD vegetated stormwater systems
are the construction and establishment phases. The timing and approach to these systems
must be carefully considered to ensure successful establishment and long-term performance.
Bioretention systems are now common stormwater treatment devices for new urban
developments in Queensland. Successful construction and allowing adequate time for the
systems to establish is critical to their long-term performance and function. Construction of
the system is also linked to having suitable bioretention designs in place to ensure, civil
contractors have appropriate plans to construct to. Applying due care in the design and
construction phase will ensure the function of the system whilst also keeping on-going
maintenance to a minimum. It is highly recommended that the constructed activities be
completed in accordance with the Construction and Establishment Guidelines: Swales,
Bioretention Systems and Wetlands (Apr 2010). This will require a sacrificial turf layer to be
installed to protect the filter media from the building phase.
Operational
It is not proposed for water quality monitoring of the bioretention system to be undertaken
during the operational phase of its life. The “Maintaining Vegetated Asset” guideline
highlights that water quality monitoring is not recommended to determine the performance
of every vegetated stormwater asset, as it is a specialized field that is complex and costly. In
line with this guideline the on-going monitoring of water quality from this device is not
considered necessary considering the small size of the development.
The bioretention system will be maintained by the NSC, who as the asset custodian, will be
responsible for the on-going maintenance of the water quality device. Maintenance for the
bioretention basin may involve the following:
1. Scheduled inspections;
2. Removal of noxious plants or weeds;
3. Maintaining the desired vegetation;
4. Repairing erosion;
5. Unblocking inlets and outlets;
6. Removing litter and debris;
7. Managing algal or moss growth; and
8. Maintaining the permeability of the filtration.
Operations and maintenance should be conducted in accordance with the Maintaining
Vegetated Stormwater Assets (Feb 2012) guideline.
21-0166SMP01-V1 | Stormwater Management Plan | 25 Pavilion Street, Pomona | 16
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.