Skip to the record
Trusted by locals. Built for Noosa.

Original source · versioned page text

Swmp

of 32

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

      CONTENTS
      1.    INTRODUCTION .............................................................................................................................. 1
            Site Location .................................................................................................................................. 2
            Flood Overlay ................................................................................................................................ 2
            Lawful Point of Discharge ............................................................................................................ 3

      2.    STORMWATER QUANTITY ............................................................................................................... 4
            Hydrologic Assessment................................................................................................................. 4
            2.1.1.             Existing Scenario ........................................................................................................ 4
            2.1.2.             Rational Method Check .......................................................................................... 5
            2.1.3.             Developed Scenario ................................................................................................ 6
            2.1.4.             Mitigation Scenario ................................................................................................... 7
            Flood Immunity .............................................................................................................................. 9

      3.    STORMWATER QUALITY ............................................................................................................... 10
            Design Objectives ....................................................................................................................... 10
            Stormwater Quality Treatment .................................................................................................. 10
            3.2.1.             Strategy .................................................................................................................... 10
            3.2.2.             MUSIC Parameters .................................................................................................. 10
            3.2.3.             Catchment Areas ................................................................................................... 11
            3.2.4.             MUSIC Model Layout .............................................................................................. 12
            Treatment Measures ................................................................................................................... 13
            3.3.1.             Bioretention System ................................................................................................ 13
            3.3.2.             Sediment Forebays ................................................................................................. 14
            Results ........................................................................................................................................... 14

      4.    CONSTRUCTION PHASE MANAGEMENT .................................................................................... 15
            Erosion and Sediment Control................................................................................................... 15

      5.    ESTABLISHMENT AND OPERATIONAL PHASE MANAGEMENT .................................................. 16
            Establishment............................................................................................................................... 16
            Operational ................................................................................................................................. 16

      6.    CONCLUSION .............................................................................................................................. 17

      7.    REFERENCES ................................................................................................................................. 18


      LIST OF TABLES
      Table 2-1: Summary of Existing Catchment Parameters .................................................................. 5
      Table 2-2: Existing Catchment Peak Flows ......................................................................................... 5
      Table 2-3: Comparison of WBNM and Rational Method Peak Flows ............................................. 5
      Table 2-4: Summary of Developed Catchment Parameters ........................................................... 6
      Table 2-5: Comparison of Peak Flows At Site Outlet (Existing Vs. Developed) .............................. 7




21-0166SMP01-V1 | Stormwater Management Plan | 25 Pavilion Street, Pomona
Log in to download the original file

SWMP.pdf · 4.9 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.