Original source · versioned page text
Swmp
Table 2-6: Summary of Basin Structure Details ................................................................................... 7
Table 2-7: Comparison of Peak Flows Site A (Existing Vs. Mitigated) .............................................. 8
Table 3-1: Site Stormwater Quality Objectives (Operational Phase) ............................................ 10
Table 3-2: Urban land use (Split Source Nodes) - Pollutant Export Parameters ........................... 11
Table 3-3: MUSIC Runoff Generation Parameters ........................................................................... 11
Table 3-4: Catchment Areas ............................................................................................................. 11
Table 3-5: Bioretention Design Parameters ...................................................................................... 13
Table 3-6: Sediment Forebay Design Parameters ........................................................................... 14
Table 3-7: MUSIC Results – Load Based Pollutant Outputs ............................................................. 14
LIST OF FIGURES
Figure 1-1: Site Location ....................................................................................................................... 2
Figure 1-2: Overland Flow Paths and Flood Hazard Overlay Mapping ......................................... 3
Figure 2-1: Existing Catchment Delineation ....................................................................................... 4
Figure 2-2: Developed Catchment Delineation ............................................................................... 6
Figure 2-3: Development Located above the Regional 1% AEP Flood Extent .............................. 9
Figure 3-1: WSUD Catchment Locality Plan ..................................................................................... 12
Figure 3-2: MUSIC Model Layout ....................................................................................................... 12
APPENDICES
Reconfiguration of Lot Plan and Concept Engineering Drawings
Rational Method and WBNM Outlet
21-0166SMP01-V1 | Stormwater Management Plan | 25 Pavilion Street, Pomona
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.