GENERAL COMMITTEE MEETING MINUTES 12 APRIL 2021
Construction Traffic Management Plan
50. A Construction Management Plan must be submitted with the Operational
Works application and must address the following:
a. traffic management during all aspects of the construction phase
including:
i. a Traffic Management Control Plan in accordance with the
Manual of Uniform Traffic Control Devices (MUTCD) detailing
all temporary signage and traffic control measures prior to
construction
ii. maintenance of safe pedestrian access for the areas affected
by the works during and after daily construction has ceased
iii. proposed fencing to the site during the construction phase of
the development
iv. approval of the Traffic Management Control Plan by the
Department of Transport and Main Roads (DTMR) for any
works on State controlled roads
v. provision for worker car parking
b. maintenance and protection of water quality and existing drainage
lines through the construction site, through the implementation of
appropriate erosion and sediment control measures
c. works programme identifying key components of the works and their
respective durations
d. establishment of a communication protocol with the general public,
adjoining owners, emergency services and local businesses to
advise of agreed construction times, impacts on traffic, services and
other relevant issues.
e. Include a post out to the local residents and businesses advising of
the proposed development, the expected time frames and the site
contact details.
f. Include signage in prominent locations on the boundaries of the site
advising of the proposed development, the expected time frames and
the site contact details.
g. identification of complaint management procedures including:
i. contact details for the on-site manager
ii. dispute resolution procedures
h. details on the location of external fill sites/sources, the haulage route,
type of vehicle to be utilised during filling operations and frequency
of usage. NB any damage to the existing road system as a result of
haulage operations shall be fully repaired at the applicant’s expense
B. Note the report is provided in accordance with Section 63(5) of the Planning Act
2016.
C. Request the Chief Executive Officer to investigate the existing traffic and car
parking concerns in Viewland Drive, Noosa Heads raised by residents in their
submissions to Application No. MCU20/0128 for a Residential Care Facility at 32
Viewland Drive, Noosa Heads.
Carried unanimously.
Cr Stewart re-joined the meeting.
Page 10 of 16
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.