GENERAL COMMITTEE MEETING MINUTES 12 APRIL 2021
Stormwater Quality
46. The development must include a stormwater quality treatment system
designed to achieve 80% reduction in Total Suspended Solids, 60%
reduction in Total Phosphorous, and 45% reduction in Total Nitrogen
compared to an unmitigated scenario, prior to discharge from the site.
47. The stormwater quality treatment system must be in accordance with an
Operational Works approval for stormwater drainage and, the Queensland
Urban Drainage Manual. The application for Operational Works Approval
must demonstrate that:
47.1. all runoff can be filtered via vegetated areas prior to discharge from
the site.
47.2. pollutant reduction predicted for the stormwater quality treatment
train is designed in accordance with the Water by Design MUSIC
modelling guidelines (Version 1) 2010.
47.3. Detail design plans for the stormwater treatment train, and submitted
for the Operational Works approval, demonstrate the size of water
quality improvement features are consistent with the MUSIC model,
and are visually integrated into the development in accordance with
the Water by Design Bio-retention Technical Design guidelines
(Version 1.1) October 2014.
47.4. Any necessary retaining walls within bio retention basins must not
exceed 0.8m in height. The operational works approval application
must detail proposed rock finishing on any retaining walls, and these
approved finishes shall be maintained for the life of the development.
Raw finished concrete block retaining walls will not be approved.
47.5. The application for operational works approval must include the
design for educational signage to be included within/alongside the
bio-retention basin. Signage must follow a green and white colour
pallet and state “This bio retention basin cleans stormwater runoff
prior to its discharge to The Noosa River”.
47.6. Stormwater detention must be included in the stormwater treatment
train design, and maintained to facilitate for stormwater flows
discharging from the development to be consistent with pre-
development characteristics.
47.7. Stormwater discharges are provided with a free draining outlet and
connect to a lawful point of discharge in accordance with PSP6
Engineering Design Standards - Roads, drainage and earthworks
48. All stormwater quality treatment devices must be maintained in accordance
with the Water by Design (2012) - Maintaining Vegetated Stormwater
Assets (Version 1). A copy of this document must be retained on the site
together with the approved Operational Works drawings for the stormwater
quality treatment system and a detailed life cycle costing of the system
attached as an addendum. Records of all maintenance activities
undertaken must be kept and made available to Council upon request.
49. Any proposed Community Management Statement required for the
development must include the Water by Design (2012) – Maintaining
Vegetated Stormwater Assets (Version 1) document and must include the
full cost of maintaining the system in accordance with that document.
Page 9 of 16
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.