ii. The proposal includes a gate at the boundary which will result in vehicles
accessing the site blocking either the footpath or the traffic lanes or both;
iii. There is no passing opportunity between the front boundary and the car
parking located at the rear ground floor.
Provide revised plans that indicate:
(a) The access driveway located clear of any existing infrastructure or indicate
on the plan any relocated infrastructure,
(b) The reconfiguration of the existing on-street carparking that does not result
in the loss of spaces.
(c) The gate relocated within the site sufficient to allow a vehicle to wait within
the site (minimum 6m).
(d) A passing opportunity between the front boundary and the carparking area.
It is recommended that the passing opportunity (5.5m wide) be provided
near the front boundary.
Response
The proposed development has been reviewed and recommended changes have been
made. Please refer to the attached amended drawings.
3ia) The proposed driveway has been located to the site’s western boundary. This
location provides suitable separation between neighbouring driveways and
enhancement of the built form which results in a visually appealing amenity to
the street frontage. To accommodate the driveway at this location the existing
power pole will be relocated and an application has been lodged with Energex
for its removal. The water meter will also be relocated. The sluice valve (SV)
will not be impacted upon and will remain. The Telstra pit is unlikely to be
impacted and if required the cover can be replaced with a lid suitable to cater
for vehicles loads. Please refer to attached drawing SD.201 S3 for details.
3i (b) On-street parking is provided on Gympie Terrace in the vicinity of the subject
site. There are two spaces along the site frontage. The proposed access
driveway location on Gympie Terrace will result in the removal of one on-
street parking space, however the closure of the existing property access will
allow for another on-street parking space to be line marked in its place. The
proposed development therefore does not result in a loss of on-street vehicle
parking spaces. Car parking spaces will comply with AS2890.5 Figure 2.1 for
on-street parallel parking. Please refer to the attached concept plan provided
by RoadPro regarding on-street parking relocation arrangements.
RoadPro Development ABN 98 615 073 565
15652 Gympie Tce Units RFI Response Page 2 of 4
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Traffic Engineering advice.PDFRelated documentApplication case desk ↗
About this file
- File size
- 864 KB (small file)
- File type
No other editions are linked here.