Original source · versioned page text
Att 2 SWMP
Rational Method Calculations Project number: 20210121 Calculations: B. Parry Street Address 16 Rene St Date: 7/10/2021 Locality: Noosaville, Noosa Shire Council Site Area Composition Existing Site Roof Area: 350.5 m2 Developed Site Roof Area: 477.62 m2 Existing Site Paved Area: 265.19 m2 Developed Site Paved Area: 396.28 m2 Existing Site Total (Impermeable): 615.69 m2 Developed Site Total (Impermeable): 873.9 m2 Existing Site Total (Permeable): 683.3445 m2 Developed Site Total (Permeable): 425.1345 m2 Total Site Area: 1299.0345 m2 Increase Impermeable Area: 258.210 m2 0.026 Ha. Time of Concentration Existing Site Proposed Site tc 5.0 mins tc 5.00 mins Rational Method - Peak Flow Calculation Existing Site Proposed Site Area (Ha.) 0.130 Ha. Area 0.130 Ha. fi 0.474 Fi 0.673 1 1 I10 80.987 mm/hr I10 80.987 mm/hr C10 0.79 C10 0.83 A.E.P Fy Cy Iy Qy (m3/s) A.E.P Fy Cy Iy Qy (m3/s) 63.2% AEP 0.8 0.636 135.16 0.031 63.2% AEP 0.8 0.668 135.16 0.033 50% AEP 0.85 0.676 152.60 0.037 50% AEP 0.85 0.709 152.60 0.039 20% AEP 0.95 0.755 208.19 0.057 20% AEP 0.95 0.793 208.19 0.060 10% AEP 1 0.795 245.25 0.070 10% AEP 1 0.835 245.25 0.074 5% AEP 1.05 0.835 280.13 0.084 5% AEP 1.05 0.876 280.13 0.089 2% AEP 1.15 0.914 325.91 0.107 2% AEP 1.15 0.960 325.91 0.113 1% AEP 1.2 0.954 360.79 0.124 1% AEP 1.2 1.001 360.79 0.130
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.