Att 2 SWMP
Rational Method Calculations Project number: 20210121 Calculations: B. Parry Street Address 16 Rene St Date: 7/10/2021 Locality: Noosaville, Noosa Shire Council Validation of Pre-Development Model Pre / Post Comparison A.E.P Q (m3/s) - WBNM Q (m3/s) - Rational Differential A.E.P Qy Pre (m3/s) Qy Post (m3/s) Qchange (m3/s) Qchange (%) 63.2% AEP 0.031 0.031 0% 63.2% AEP 0.031 0.034 0.003 10% 50% AEP 0.038 0.037 -3% 50% AEP 0.038 0.040 0.002 5% 20% AEP 0.062 0.057 -8% 20% AEP 0.062 0.065 0.003 5% 10% AEP 0.077 0.070 -9% 10% AEP 0.077 0.082 0.005 6% 5% AEP 0.093 0.084 -10% 5% AEP 0.093 0.094 0.001 1% 2% AEP 0.106 0.107 1% 2% AEP 0.106 0.108 0.002 2% 1% AEP 0.116 0.124 7% 1% AEP 0.116 0.121 0.005 4% Validation of Post-Development Model Pre / Post (OSD) Comparison A.E.P Q (m3/s) - WBNM Q (m3/s) - Rational Differential A.E.P Qy Pre (m3/s) Qy OSD (m3/s) Qchange (m3/s) Qchange (%) 63.2% AEP 0.034 0.033 -3% 63.2% AEP 0.031 0.030 -0.001 -3% 50% AEP 0.040 0.039 -3% 50% AEP 0.038 0.036 -0.002 -5% 20% AEP 0.065 0.060 -8% 20% AEP 0.062 0.059 -0.003 -5% 10% AEP 0.082 0.074 -10% 10% AEP 0.077 0.074 -0.003 -4% 5% AEP 0.094 0.089 -5% 5% AEP 0.093 0.085 -0.008 -9% 2% AEP 0.108 0.113 5% 2% AEP 0.106 0.099 -0.007 -7% 1% AEP 0.121 0.130 7% 1% AEP 0.116 0.107 -0.009 -8%
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.