Att 2 SWMP
Stormwater drainage design Table 9.4.8.3 Criteria for assessment (part)
Performance Outcomes Acceptable Outcomes Response
Stormwater drainage design
PO1 AO1
The development and its stormwater management system is planned and A stormwater management plan is prepared consistent with PSP6 Engineering Design Standards - Roads, drainage and Complies - Refer to the SWMP that has been designed to be consistent with the PSP6 Engineering Design Standards -
designed having regard to: earthworks. Roads, drainage and earthworks and QUDM.
1. the natural features of the site;
2. the need to avoid impacts and potential risks to ecologically important
areas;
3. the likely effectiveness of erosion and sediment control and stormwater
drainage measures during rainfall events during and post construction; and
4. the need to protect environmental values and water quality of receiving
waters both during and post construction.
PO2 AO2.1
Stormwater drainage planning, design and construction is in accordance with PSP6 Engineering Design Standards -
Stormwater drainage infrastructure is planned, designed and constructed to: To be complied with at detailed design in conjunction with the SWMP
Roads, drainage and earthworks and the latest version of the Queensland Urban Drainage Design Manual.
1. incorporate allowance for increased flood risk and tidal inundation through
AO2.2
pipework as a result of cilmate change and sea level rise;
The stormwater drainage system connects to a lawful point of discharge in accordance with PSP6 Engineering Design
2. ensure the development is adequately drained; and Complies - Stormwater drainage connects into existing Council owned stormwater drainage line
Standards - Roads, drainage and earthworks.
3. ensure stormwater is managed and lawfully discharged without altering
stormwater drainage characteristics external to the site.
AO2.3
Stormwater flows discharging from the development are demonstrated to be consistent with pre-development Complies - Refer to SWMP. The increase in flows arising from the development have been mitigated to pre-development
characteristics. levels.
AO2.4
Development provides for the management of stormwater to incorporate appropriate allowance for climate change
Complies - A 20% increase to rainfall intensities has been considered to account for climate change impacts. Refer to
impacts (including rainfall intensity and sea level rise), in accordance with PSP6 Engineering Design Standards – Roads,
SWMP.
Drainage and Earthworks.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.