Att 2 SWMP
PO3 AO3.1
Stormwater drainage infrastructure conveys run-off in a manner that allows
Stormwater drainage infrastructure meets the desired standards of service for roads functionality set out in PSP6 Complies - The site captures and mitigates new run-off to pre-existing levels, and discharges into an existing Council
roads to deliver desired standards of service appropriate to the local conditions
Engineering Design Standards - Roads, Drainage and Earthworks. Stormwater network. Existing infrastructure will no be impacted by the development.
and local stormwater drainage characteristics.
PO4 AO4.1
Stormwater infrastructure is compatible with existing infrastructure, allows for
The location, design and construction of stormwater drainage structures is in accordance with PSP6 Engineering Design
easy access for the ongoing maintenance by Council, is cost effective across its To be complied with at detailed design in conjunction with the SWMP
Standards - Roads, drainage and earthworks.
design life.
AO4.2
Where infrastructure is located on private land an easement is dedicated over the infrastructure in accordance Complies - The stormwater solution proposes to connect into an existing drainage system within an easement through
with PSP6 Engineering Design Standards - Roads, drainage and earthworks. the property.
AO4.3
Any alterations or repairs to infrastructure as a result of the development are made at no cost to Council. To be complied with at detailed design in conjunction with the SWMP
AO4.4
Development avoids stormwater inflow and infiltration to the sewer infrastructure network. Complies - no stormwater discharged to sewer network.
AO4.5
Stormwater infrastructure is designed to minimise maintenance costs and the requirement for specialized equipment for Complies - Maintenance of the stormwater solution is the responsibility of the site owner and no additional
maintenance techniques. infrastructure is to be maintained by Council.
PO5 AO5.1
Stormwater drainage infrastructure is aligned to avoid crossing waterways,
wetlands, drainage lines and ecological important areas, or where it is Stormwater drainage infrastructure avoids crossing waterways, wetlands drainage lines and ecologically important areas
Complies - Refer to stormwater layout plan. No waterways or ecologically important areas are impacted.
demonstrated this is unavoidable, disturbed areas are reinstated and revegetated or follows the edge of existing disturbed areas.
upon completion of works.
AO5.2
Stormwater drainage infrastructure is co-located with other infrastructure within a combined utility corridor where
N/A - Stormwater is wholly contained within the proposed site.
appropriate.
AO5.3
Temporary vehicular crossings of waterways must be designed and constructed to be consistent with the current
N/A - No waterways are impacted by the proposed development.
International Erosion Control Association Best Practice Book Series.
See the original