Original source · versioned page text
Att 2 SWMP
INTRODUCTION RECOR has been commissioned to prepare a preliminary Stormwater Management Report to accompany a development application for a caretaker building and an additional carparking area within an existing industrial lot. This report examines the stormwater management considerations for the existing and proposed development site and assesses how the run-off from the site is to be managed in accordance with Noosa Shire Council requirements for stormwater drainage. Project number 20210121 File RECOR Preliminary Stormwater Management Report - 20210121.docx, 2021-10-07 Page 4 of 26 Revision 0 P +61 7 5211 1003 A 37 Mary St, Noosaville Qld 4566 E [email protected] recorconsulting.com
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.